Guidance for the design and maintenance of stepped spillways

This project researched the safety of stepped spillways made of masonry, following similar structures failing at Boltby and Ulley reservoirs.

Documents

Guidance for the design and maintenance of stepped spillways - final report (10 MB) PDF

Guidance for the design and maintenance of stepped spillways - technical summary (1 MB) PDF

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email: [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This project researched the safety of stepped spillways made of masonry, after similar structures failed at Boltby and Ulley reservoirs. The project produced this technical report which includes guidance on the design and maintenance of stepped masonry spillways. It also includes good practice for structural inspections to prevent future failures.

The project started in June 2008 and was completed in October 2010.