Consultation outcome

A1 Birtley to Coal House improvement scheme options

This consultation has concluded

Detail of outcome

Highways England has published its response to this consultation, and the Consultation Report can be found on the scheme web page in the ‘Media & documents’ section.


Original consultation

Summary

Proposals to improve the A1 between Birtley and Coal House from junctions 65 to 67.

This consultation ran from
to

Consultation description

We are considering options to improve the A1 between Birtley and Coal House from junctions 65 to 67 by widening it to a 3 lane carriageway and replacing Allerdene Railway Bridge.

We have narrowed our designs down to 2 options:

  • option 1a involves the reconstruction of Allerdene Railway Bridge south of its current location, improving the existing road alignment and safety. To accommodate the new alignment, Smithy Lane overbridge will have to be replaced.

  • option 1b involves the replacement of Allerdene Railway Bridge in its current location. This will require a temporary bridge to be constructed to carry traffic over the A1 while the new bridge is constructed. This option is a more complex scheme to construct requiring more traffic management and a longer construction period.

We would like your feedback on these proposals.

Documents

A1 Birtley to Coal House

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Updates to this page

Published 26 August 2016

Sign up for emails or print this page