News story

HS2 FCC TWA information event 25 May 2016: Calvert Green

We are holding an event about HS2’s plans to relocate the Calvert railway sidings.

The original plans for HS2 included moving the sidings operated by FCC Waste Services (UK) Ltd to the east of the Aylesbury Link railway line.

HS2 Ltd is now developing plans to move the sidings to the south of Sheephouse Wood, near the Greatmoor Energy from Waste Facility.

At the event we will:

  • provide further information on the proposals;
  • have representatives from HS2 and FCC available for you to talk to;
  • let you know how you can comment on the proposals, and provide information about the powers we are seeking to implement the plans.

The event will be taking place at:

Calvert Green Community Hall, Cotswolds Way,
Calvert Green,
Buckinghamshire,
MK18 2FJ

Please feel free to join us at any time on:

Wednesday 25th May between 1pm and 7pm

For further information regarding this event, please contact us at [email protected]

Proposed Construction Layout (PDF, 504 KB, 1 page) Proposed Construction Layout – Access Road Plan A (PDF, 327 KB, 1 page) Proposed Construction Layout – Access Road Plan B (PDF, 288 KB, 1 page) Proposed Operational Layout (PDF, 987 KB, 1 page)

Updates to this page

Published 13 May 2016