Press release

New River Medway bridge constructed with low carbon materials

Old recycled fishing nets provide fibre-reinforced polymer. Lower maintenance needed than for conventional materials. Improved river access to Twyford Marina.

What a catch?! Old fishing nets put to good use to create a brand new bridge across the River Medway in Kent

The Environment Agency has used innovative technology to install a new 16-metre long bridge over the entrance to Twyford Marina at Yalding, Kent. This is part of its navigation capital investment programme.

The bridge body and deck are made from fibre-reinforced polymer (FRP), recycled from old fishing nets. Ramps on either side of the bridge were in block form and could be laid by hand, mostly without the use of mortar, similar to Lego bricks. The block system also removes the need for reinforced concrete walls. 

The bridge deck was built in the Netherlands. Weighing in at 3.5 tonnes, it was shipped to Nottinghamshire where handrails were added, then was hauled by road to Yalding. The final leg was by barge along the River Medway, where it was lifted into position by crane.

Easy does it! The Medway's newest bridge is lowered into place. Its fibre-reinforced polymer structure won't need as much maintenance as conventional bridges

The new footbridge forms part of the Medway Valley Walk and provides passage over the river entrance of Twyford Marina and significantly improves boat access to the marina.

With the finishing touches completed, the bridge is now open to the public. Permanent handrails and path surface to install to the ramps will be carried out in the autumn to replace the current temporary handrails.

Jason Adams, Environment Agency navigation manager for Kent, said,

The bridge is both light and strong, meaning we could install the structure in a difficult location. With its lighter weight we could also reduce the size of the supporting foundations required giving a lower carbon footprint.

Overall, it will require less maintenance compared to a bridge made of traditional materials and enables a substantial carbon saving, helping Medway navigation to contribute to the Government’s carbon net zero target.

The old bridge before it was replaced

Contact us:

Journalists only: 0800 141 2743 or [email protected]

Updates to this page

Published 6 August 2024