Guidance

Funding instruction for Afghan schemes: integration support, 2023 to 2024 (accessible version)

Updated 25 April 2024

Funding Instruction for local authorities in the support of the Afghan Citizens Resettlement Scheme and Afghan Relocation and Assistance Policy

Afghan Relocations and Assistance Policy (ARAP) and Afghan Citizens Resettlement Scheme (ACRS) plus eligible British Nationals

INTEGRATION SUPPORT

Grant Reference Number: 392

Financial Year 2023-2024

Resettlement Operations
Lunar House
Croydon
CR9 2BY

Date of issue 31 March 2024

Version 2.0

© Crown copyright 2021

This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open-government-licence/version/3 or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: [email protected].

Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned.

This publication is available at www.gov.uk/government/publications

Any enquiries regarding this publication should be sent to us at: mailto:

[email protected]

TERMS AND CONDITIONS OF FUNDING

1. DEFINITIONS

1.1. An “Adult” for the purpose of the English language provision means a Beneficiary who is 19-years of age or older, or who turns 19 within the first twelve (12) Months of arrival in the UK.

1.2. An “Annex” means the annexes attached to this Funding Instruction.

1.3. The “Authority” means the Secretary of State for the Home Department acting through the Home Office’s Resettlement Operations on behalf of the Crown.

1.4. A “Beneficiary” means: (i) those resettled under the Afghan Citizens Resettlement Scheme (ACRS) and their immediate dependants (including family members of British Nationals) under Pathway 1; and (ii) those relocated under the Afghan Relocation and Assistance Policy (ARAP) scheme and their immediate dependants; and (iii) eligible British Nationals, (iv) in addition the ACRS has been expanded to include those who have been recognised as Refugees by UNHCR and resettled to the UK under ACRS Pathway 2, and (v) those relocated under the ACRS Pathway 3.

Beneficiary is defined as each adult, child and baby arriving in the UK.

1.5. “Branding Manual” means the HM Government of the United Kingdom of Great Britain and Northern Ireland’s Branding Manual ‘Funded by UK Government’[footnote 1] first published by the Cabinet Office in November 2022, including any subsequent updates from time-to-time;

1.6. A “British National” means a person who holds one of the six types of British nationality. The six types are set out here: https://www.gov.uk/types-of-british-nationality

1.7. A “Case of Interest” means a Beneficiary has:

  • Been arrested for an offence involving violence; weapons; terrorism/extremism; sexual offences (criminality).

  • Been subjected to a hate crime (hate crimes).

  • Had a PREVENT referral made regarding them (PREVENT referral).

  • Suffered a serious negative impact (or perceived they have) because of an act or omission by the Home Office and/or local authorities/delivery partners’ (perceived failing).

  • Been involved in any other incident which the media is aware of (potential media coverage).

1.8. A “Community Sponsor” (or “Sponsor”) means a group or organisation which:

1.8.1. exists and works for the benefit of the community rather than private shareholders, and

1.8.2. is registered as either a charity (or from 2013 as a charitable incorporated organisation), or a community interest company, or is an individual or body falling within Section 10(2)(a) of the Charities Act 2011, and

1.8.3. has been approved by the Authority to support those resettled to the UK under the ACRS or the UK Resettlement Scheme (UKRS), and

1.8.4. can claim Funding to support English Language Provision for Adult Beneficiaries resettled under the ACRS as at Schedule 1 Part 6 and Void Costs at Annex D.

1.9. A “Clause” means the clauses in this Funding Instruction.

1.10. “Commencement Date” means the date on which the Funding Instruction comes into effect and from which Eligible Expenditure may be claimed, being the 01 April 2023, or later as indicated under non-integration tariff funding.

1.11. The “Community Sponsorship Scheme” means the programme developed by the Authority to enable a Community Sponsor to support those resettled to the UK under the ACRS or the UKRS for a period of twenty-four (24) Months following the start of their support by a Community Sponsor.

1.12. “Key Performance Indicators” means the indicators required to assess the success of the Funding against its intended outcome.

1.13. “Crown Body” (or “Crown”) means the governments of the United Kingdom (including the Northern Ireland Assembly and Executive Committee, the Scottish Executive and the National Assembly for Wales), including, but not limited to, minsters and departments and particular bodies, persons, commissions, or agencies from time-to-time carrying out functions on its behalf.

1.14. “Data Protection Legislation” means (i) the UK GDPR, (ii) the Data Protection Act 2018 (‘DPA 2018’) to the extent that it relates to the processing of Personal Data and privacy, (iii) all applicable Law about the processing of Personal Data and privacy, and (iv) (to the extent that it applies) the EU GDPR.

1.15. The “Data Sharing Protocol” (or the “DSP”) means the set of principles detailed in Annex B which govern the processes and practicalities of information sharing between the Authority and the Recipient, and which the Recipient agrees to abide by and comply with.

1.16. “Day” means any calendar day Monday through Sunday (inclusive).

1.17. “Delivery Partner” means any Third-Party, who is not a Beneficiary, whether an organisation or an individual working with the Recipient, whether remunerated or not, in the delivery of this Funding Instruction for the provision of the Purpose.

1.18. “Eligible Expenditure” means all costs, expenses, liabilities, and obligations that are related to, incurred by, or arise out of the delivery, activities, and operations of the Purpose by the Recipient during the funding period 01 April 2023 to 31 March 2024 and which comply in all respects with the eligibility rules set out in this Instruction as determined by the Authority at its sole discretion.

1.19. “Eligible British Nationals” are those who:

a) were evacuated from Afghanistan by UK military, other NATO countries or regional state during Operation PITTING

OR

b) were assisted by HMG to leave Afghanistan after Operation PITTING, with this assistance commencing before 6 January 2022.

[For the purpose of this funding instruction, assistance means eligibility was established by the FCDO for inclusion in Qatari Government charter flights from Kabul to Doha; or FCDO assistance to enable legal border facilitation from Afghanistan to a third country (such as submitting Note Verbales to host governments to seek permission for British Nationals to cross their borders).]

AND

c) entered bridging accommodation OR presented as homeless to a council.

1.20. “ESOL” means a formal ‘English for Speakers of Other Languages’, or other equivalent formal language skill support.

1.21. “Exceptional Costs” means additional expenses incurred by a Recipient in supporting a Beneficiary for which the Authority has a budget and may, on a case-by-case basis, agree to reimburse.

1.22. A “File Share Area” (or the “FSA”) means the designated area within MOVEit from where a Recipient can access files that the Authority has made available to share.

1.23. “Find Your Own Accommodation” (or “FYOA”) means where Beneficiaries are supported to find their own settled accommodation.

1.24. “Flexible Housing Fund (FHF)” means funding available to help the Recipient to source settled accommodation or support a Beneficiary to secure settled accommodation at the earliest opportunity.

1.25. “Formal Language Training” means the provision of ESOL that, where possible, should lead to Beneficiaries attaining accredited qualifications from a provider regulated by an appropriate national body (i.e. OFQAL, SQA or Qualifications Wales). This also includes courses which do not themselves lead to an accredited qualification, but which help Beneficiaries to later access a course which does lead to an accredited qualification. For instance, non-regulated provision offered by providers at pre-entry level, for which there are no accredited qualifications. All formal language training must meet the following key characteristics:

1.25.1. Their delivery is led by qualified tutors, and

1.25.2. They are appropriate to individual Beneficiary’s abilities as identified following a diagnostic assessment led by a qualified ESOL tutor, and

1.25.3. They follow agreed curricula.[footnote 2]

1.26. The “Funding Instruction” (or the “Instruction”) means this document which describes the conditions under which a Recipient may claim Funding.

1.27. The “Funding Period” means the period for which the Grant is provided from the Commencement Date to 31 March 2024.

1.28. “Funding” means the Authority’s financial contributions towards a Recipient’s Eligible Expenditure incurred supporting Beneficiaries for up to thirty-six (36) Months following their arrival into a local authority area and the commencement of the provision of housing and support and in accordance with the terms and outcomes of this Instruction.

1.29. “Informal Language Training” means language training provision that does not have any or all of the characteristics described in 1.24 for example, it can take place in any location, may or may not have a pre-set curriculum and will usually be provided in a structured or semi-structured way, delivered by a range of people including volunteers. It can include confidence building, active citizenship and a whole host of leisure or community activities.

1.30. “Information Acts” means the Data Protection Legislation, Freedom of Information Act 2000 (‘FOIA’), the Environmental Information Regulations 2004 (‘EIR’) and any subordinate or amended legislation made under these Acts from time to time together with any guidance or codes of practice issued by the relevant government department(s) concerning the legislation.

1.31. “In Writing” means modes of representing or reproducing words in visible form including but not limited to paper correspondence, email, display on screen and electronic transmission.

1.32. “Law” means any applicable law, statute, byelaw, regulation, order, regulatory policy, guidance or industry code, judgement of a relevant court of law, or directives or requirements of any regulatory body, delegated or subordinate legislation.

1.33. A “Month” means a calendar month.

1.34. “MOVEit” means the Authority’s online two-way file-sharing service that allows the sharing of Official and Official-Sensitive (IL2) data with other government departments, non-departmental public bodies, and external organisations, in a completely secure environment. Files including PDFs, all types of Office documents, images, and WinZip of up to 2GB in size may be shared.

1.35. An “Overpayment” means Funding paid by the Authority to the Recipient in excess of the amount actually due.

1.36. “Personal Data” has the meaning given to it in UK Data Protection Legislation.

1.37. A “Recipient” means a participating local or regional authority to which the Authority has agreed to provide Funding under this Instruction as a contribution towards eligible expenditure incurred supporting Beneficiaries.

1.38. “Refugee” means an eligible person who, regardless of their nationality has:

1.38.1. been accepted as being in need by the Authority following referral by UN High Commissioner of Refugees (UNHCR), and

1.38.2. arrived in the UK having been admitted to the Schemes,

1.38.3. and has been resettled in England, Scotland, or Wales.

1.39. “Schedule” means the Schedules attached to this Funding Instruction.

1.40. “The Schemes”, for the purposes of this Funding Instruction, means the Afghan Citizens Resettlement Scheme (ACRS) and the Afghan Relocation and Assistance Policy (ARAP), plus Eligible British Nationals.

1.41. “Social Value” means the Authority’s commitments to delivering Value for Money, environmental and social benefits, Net Zero by 2050, efficient use of resources, greater social inclusion, support for innovation, better risk management and improved supplier relationships. These principles are underpinned by the obligations laid down in in the Social Value Act 2012, the Modern Slavery Act 2015 and the Equality Act 2010.

1.42. “Staff” means any person employed or engaged by the Recipient and acting in connection with the operation of this Instruction including the Recipient’s owners, directors, members, trustees, employees, agents, suppliers, volunteers, and Delivery Partners (and their respective employees, agents, suppliers, and Delivery Partners) used in the delivery of the funded outcomes.

1.43. “SMP” means Strategic Migration Partnership.

1.44. “Third Party” means any party whether person or organisation other than the Authority or the Recipient.

1.45. “Transitional Accommodation” means accommodation provided and paid for by the Home Office (e.g., hotels) or Ministry of Defence (transitional Service Family Accommodation) to a household whilst they are matched to a suitable property.

1.46. “Value for Money” means securing the optimum combination of cost, quality and effectiveness, including relevant Social Value criteria over the whole period of use; it does not mean minimising upfront prices i.e., the lowest or cheapest option.

1.47. A “Working Day” means any day Monday to Friday (inclusive) excluding any recognised UK public holidays.

2. THIS INSTRUCTION

2.1. This Instruction consists of fifteen (15) Articles, one (1) Schedule and seven (7) Annexes and replaces any funding instructions previously issued by the Authority providing financial contributions towards Recipients’ costs incurred supporting Beneficiaries.

2.2. This Instruction provides Funding enabling a Recipient to support Beneficiaries:

2.2.1. during the first twelve (12) Months following arrival in the Recipient’s area, including Educational costs (YEAR 1) – Schedule 1, Part 1,

2.2.2. during the subsequent twenty-four (24) Months (YEARS 2 – 3) – Schedule 1, Part 2,

2.2.3. on the Community Sponsorship Scheme (ACRS Beneficiaries only) – Schedule 1, Part 3,

2.2.4. improve their English language skills in order to assist with integration and improve employability – Schedule 1, Part 4,

2.2.5. with childcare needs to attend Formal Language Training – Schedule 1, Part 5,

2.2.6. on Community Sponsorship Scheme for adult ESOL (ACRS Beneficiaries only) – Schedule 1, Part 6 and

2.2.7. for Flexible housing funding (non-tariff) – Schedule 1, Part 7.

2.3. This Funding Instruction replaces any previously agreed terms and conditions between the Authority and the Recipients(s) to deliver support beneficiaries of the ARAP Scheme who arrived from 22 June 2021 onwards.

3. SCOPE

3.1. Claims can be made under this instruction for Beneficiaries who have arrived in the UK under one of the schemes stated at paragraphs 3.1.1 and 3.1.2, plus Eligible British Nationals.

3.1.1. The Afghan Citizens Resettlement Scheme (ACRS), which will prioritise those who have assisted the UK efforts in Afghanistan and stood up for values such as democracy, women’s rights and freedom of speech, the rule of law; and vulnerable people, including women and girls at risk, and members of minority groups at risk. This scheme will resettle up to 20,000 people at risk. Spouses, partners, and dependent children under the age of 18 of identified eligible individuals will be eligible for the scheme. Other family members may be eligible in exceptional circumstances. Unaccompanied children may be offered resettlement under the ACRS where it is determined that resettlement to the UK is in their best interests, and they have been identified as eligible for the scheme. Unaccompanied children resettled under ACRS will (unless in exceptional circumstances) be treated in the same way as Unaccompanied Asylum-Seeking Children (UASC) for funding purposes, and local authorities who accept unaccompanied children under the Scheme will be reimbursed in accordance with the relevant year’s UASC Funding Instruction not this Instruction.

3.1.2. The Afghan Relocations and Assistance Policy (ARAP), which went live on 1 April 2021, offers relocation or other assistance to those who served alongside our armed forces in Afghanistan and provided important support to His Majesty’s Government defence and security mission there, predominantly those who were employed directly, or in certain special cases via contractors, and who are assessed to be at serious risk as a result of such work. It is available to people regardless of rank or role, or length of time served, and builds on the long-standing support already available. The policy provides for the principal applicant to bring their close family members (spouse and under 18 children) to the UK and significantly expands the eligibility criteria from the previous scheme. Other family members may be eligible in exceptional circumstances. Claims under this instruction can only be made for Beneficiaries who started receiving support from a Recipient on or after 22 June 2021.

3.2. To further support these commitments, the Community Sponsorship Scheme has been developed enabling Sponsors, instead of the Recipient, to provide comprehensive wrap-around support to those resettled to the UK under the ACRS for a period of two (2) years. This funding is not available for those Afghan families resettled via the separate DLUHC “Communities for Afghans” scheme.

3.3. The Afghan Citizens Resettlement Scheme (Pathway 2) is run in partnership with the United Nations High Commission for Refugees (The ‘UNHCR’). It demonstrates the UK’s support for the UNHCR’s global effort to relieve the humanitarian crisis through the provision of resettlement opportunities for vulnerable people into communities within the UK who:

3.3.1. have registered with the UNHCR; and

3.3.2. the UNHCR consider meet one of their resettlement submission categories [footnote 3].

3.4. The Afghan Citizens Resettlement Scheme (Pathway 3) is run in partnership with the Foreign Commonwealth and Development Office (FCDO). This pathway will relocate those at risk who supported the UK and international effort in Afghanistan, as well as those who are particularly vulnerable, such as women and girls at risk and minority groups. In the first year of this pathway, the government will offer ACRS places to the most at-risk British Council and GardaWorld contractors and Chevening Alumni. 

3.5. The Recipient has made commitments to support the Schemes, and the Authority has agreed to provide Funding to the Recipient as a contribution to supporting Beneficiaries for up to three (3) years after first arrival in the Recipient’s area as further described in this Instruction.

3.6. Unless specifically stated otherwise, any Funding will be in respect of a Recipient’s costs in fulfilment of its statutory duties, and anything otherwise agreed with the Authority.

3.7. Funding can be available for beneficiaries who are owed homelessness duties under the Housing Act 1996 and have been moved into settled accommodation via the scheme in discharge of those duties.

3.8. The Recipient shall be free to determine how best to utilise the Funding but for monitoring and Schemes’ evaluation purposes must be able to demonstrate that the Funding has been committed in supporting Beneficiaries and furthering the aims of the Schemes.

4. DURATION

4.1. This Instruction sets out the terms under which the Authority will make Funding available to the Recipient, in respect of expenditure incurred supporting Beneficiaries. Claims under this Instruction can only be made for Beneficiaries who started receiving support from a Recipient on or after 01 April 2023 to 31 March 2024.

4.2. In keeping with established HM Treasury funding policies, the Authority will issue a fresh Instruction for each financial year for which Funding is approved. This will occur whether or not any changes are made.

5. TRANSPARENCY, CONFIDENTIALITY, DATA PROTECTION AND DATA SHARING

5.1. The Recipient acknowledges that grant funded arrangements issued by Crown Bodies may be published on a public facing website and that the Authority shall disclose payments made against this Instruction in accordance with the UK Government’s commitment to efficiency, transparency, and accountability.

5.2. The Recipient undertakes to keep confidential and not to disclose, and to procure that its Staff keep confidential and do not disclose any information which they have obtained by reason of this Instruction.

5.3. Nothing in this Article 5 applies to information which is already in the public domain or the possession of the Recipient other than by reason of breach of this Article 5. Further, this Article 5 shall not apply to information which is required to be disclosed pursuant to any law or pursuant to an order of any court or statutory or regulatory body.

5.4. The Recipient and the Authority will comply at all times with its respective obligations under UK Data Protection Legislation.

5.5. The Recipient shall ensure that any personal information concerning any Beneficiary disclosed to them in the course of delivering these Schemes is treated as confidential and should only be disclosed to a third party in accordance with the provisions of UK Data Protection Legislation. In the event of any doubt arising, the matter shall be referred to the Authority whose decision on the matter shall be final. In particular, the Recipient shall:

5.5.1. have in place appropriate policies and procedures to recognise and maintain the Beneficiary’s need for confidentiality; and

5.5.2. ensure that without the consent of a Beneficiary, details of that individual Beneficiary are not released to any organisation not party to this Instruction.

5.6. The Recipient shall not use any information which they have obtained as a result of delivering the Schemes (including, without limitation, any information relating to any Beneficiary) in any way which is inaccurate or misleading.

5.7. On receipt of Personal Data from the Authority, the Recipient will become an independent controller of that data in that the Recipient, in delivering the Schemes, will, at any time determine the purpose and means of the processing of the Personal Data. In doing so they shall comply with the applicable Data Protection Legislation in respect of their processing of such Personal Data, will be individually and separately responsible for its own compliance and with respect to its processing of Personal Data as independent Controller, implement and maintain appropriate technical and organisational measures to ensure a level of security appropriate to that risk, including, as appropriate, the measures referred to in Article 32(1)(a), (b), (c) and (d) of the GDPR, and the measures shall, at a minimum, comply with the requirements of the Data Protection Legislation, including Article 32 of the GDPR.

5.8. In the event of any unauthorised disclosure, the Recipient is responsible for following its local data protection arrangements and referring any Personal Data breach to the Information Commissioner’s Office within 72 hours of identifying the initial incident.

5.9. In the event of any unauthorised disclosure the Authority must be informed without delay. The Authority will decide on what, if any, remedial action should take place and the Recipient shall be bound by and will abide by the decision of the Authority.

5.10. Where a Recipient is responsible for an unauthorised disclosure in breach of this Instruction, that Recipient will be liable for any consequences of such unauthorised disclosure, including (but not confined to) any civil or criminal liability.

5.11. Prior to departure for the UK, ACRS Pathway 2 and Pathway 3 refugees will have signed a consent form confirming their willingness to share Personal Data with executive bodies and relevant Delivery Partners. The Authority will retain these forms and will allow inspection by the Recipient as requested.

5.12. The Authority also expects the Recipient to share relevant information on the delivery of the Schemes and on Beneficiaries with its partners; before doing so, the Recipient must ensure that a formal agreement has been signed with the relevant deliverers of the Schemes which flows down the terms of the Data Sharing Protocol.

5.13. The UNHCR Resettlement Registration Form (RRF) or any other related document created by UNHCR about a Beneficiary (refugee), must only be shared with Delivery Partners on a need-to-know basis.

5.14. The RRF and related documents must not be shared with the Refugee concerned, nor with any other party outside of appropriate Delivery Partners, without the specific agreement of UNHCR London office.

5.15. All approaches made by any person or organisation not party to this Instruction in respect of delivery to fund the Schemes must be referred to the Authority’s press office for their advice and/or action.

5.16. Where applicable, the Recipient and the Authority are required to comply at all times with its respective obligations under the Information Acts, any subordinate legislation made, and any guidance issued by the Information Commissioner.

5.17. The Recipient shall abide by the terms of the Data Sharing provisions set out in Annex C. The Recipient shall ensure that it has adequate provisions and effective controls in place to manage:

5.17.1. data and prevent Data Incidents.

5.17.2. the processing of data shared between itself and any Delivery Partner and/or Beneficiary (and vice versa); and

5.17.3. compliance with its obligations arising from the Data Protection Legislation.

5.18. The Recipient agrees to assist and cooperate with the Authority to enable the Authority to comply with its obligations under the Information Acts whenever a request is made for information which relates to or arises out of this Instruction.

5.19. No information shall be disclosed if such disclosure would be in breach or is exempted from disclosure under the Information Acts.

5.20. The Recipient shall ensure that it, and its Staff, comply with the Authority’s data sharing protocols as described in Annex C.

5.21. The provisions of this Article 5 shall survive the conclusion of this Instruction, however that occurs.

6. FUNDING

Eligible Expenditure

6.1. Monies provided must not be used for any purpose other than achieving delivery of the Schemes outcomes detailed at Schedule 1 of this Instruction, nor is it permissible to vire any such funds elsewhere without prior written consent from the Authority.

6.2. Any funding issues resulting from a Beneficiary moving permanently from a participating local authority during the maximum thirty-six (36) Month term of the Funding are to be resolved between the Recipient and the relevant local authority.

Ineligible Expenditure

6.3. The Grant may under no circumstances be used to:

6.3.1. pay for lobbying (via an external firm or in-house staff) in order to undertake activity that intends or attempts to influence Parliament or Crown Bodies or political parties, for example, attempting to influence legislative or regulatory action; or the awarding or renewal of contracts and grants; or attempting to influence legislative or regulatory action, or

6.3.2. enable one part of government to challenge another on topics unrelated to the Purpose, or

6.3.3. petition the Authority or other Third Parties for additional funding, or

6.3.4. pay expenses, such as entertaining, specifically aimed at exerting undue influence to change government policy, or

6.3.5. pay input VAT reclaimable by the Recipient from HMRC, or

6.3.6. fund activity that may be party-political in intention, use, or presentation, or

6.3.7. support or promote activities of an exclusively religious nature. This will not include activity designed to improve inter-faith relationships or working.

6.3.8. pay towards litigation costs incurred by the Recipient.

Duplicate Funding

6.4. The Recipient shall not apply for or obtain Duplicate Funding for the same expenditures whilst they are in receipt of Funding under this Instruction. To avoid there being Duplicate Funding the Authority will require the Recipient to repay as an Overpayment.

6.5. The Authority may refer the Recipient or any Delivery Partner to the police should it fail to notify the Authority of, or dishonestly and intentionally obtain, Duplicate Funding to deliver the Purpose.

Overpayments

6.6. The Authority must be notified at the earliest opportunity if a Recipient expects its Funding requirement to be lower than expected, in order to avoid Overpayments.

6.7. In the event that an Overpayment is made, howsoever caused, the Authority must be notified as soon as reasonably practicable. In such instances, the Authority may require immediate reimbursement of the Overpayment or may adjust subsequent payment(s) accordingly.

Cessation of Funding

6.8. The Authority’s responsibility for providing Funding under this Instruction will cease no later than the thirty-six (36) Month anniversary of the commencement of support to Beneficiaries under the Schemes and Funding is not claimable for any support provided beyond this anniversary.

6.9. Payments may also cease where the Beneficiary:

6.9.1. dies,

6.9.2. leaves the Recipient’s area to live in another UK local authority area,

6.9.3. indicates that they no longer wish to receive support under the Schemes,

6.9.4. indicates that they are leaving the UK permanently,

6.9.5. applies for some other Immigration status within the UK, or

6.9.6. otherwise leaves or becomes ineligible for the Schemes.

6.10. In the event of any such occurrence under Clause 6.8, the Recipient must notify the Authority without delay.

6.11. For the purposes of Clause 6.7, the thirty-six (36) Month period will commence on the date that the Beneficiary arrives with the Recipient, and the commencement of support, and will continue unbroken until the end of that thirty-six (36) Month period.

6.12. The Authority reserves the right to cease making payments through this Instruction if it has reasonable grounds to believe that the Beneficiary has sought to deceive the Authority, the relevant Recipient, or a partner agency in relation to their circumstances, including their inclusion on the Schemes or their activities whilst so involved.

Exceptional Costs

6.13. Payments may also be made to cover additional essential costs incurred by the Recipient above and beyond what could reasonably be regarded as normal expenditure and not available through other mainstream funding mechanisms. Funding from the Exceptional Costs budget may be used, amongst other things, to pay for:

  • Property Adaptations (see Annex D)

  • Property Void Costs (see Annex E)

  • Support for children with identified educational needs.

  • Social Care provision

  • Universal Credit nominal top-up (see Schedule 1, Clause 1.12)

6.14. Before incurring Exceptional Costs, a Recipient shall seek agreement in writing from the Authority’s Afghan Schemes Payments Team or risk having the claim rejected. The Authority will use its reasonable judgement when assessing mitigations for claims where this has not been possible (see Annex F).

6.15. All applications will be assessed, and payments made, on a case-by-case basis:

6.15.1. There is no minimum or maximum amount that can be claimed.

6.15.2. Exceptional Costs cannot be claimed for support provided to a Beneficiary that would normally be funded through the per capita health or education funding or through welfare payments.

6.15.3. Recipients must submit evidence of Exceptional Cost expenditure incurred (e.g., copy invoices) along with an Exceptional Costs claim form, before claims will be considered for payment.

6.16. The Authority will periodically review the operation of the Exceptional Costs process and budget.

Additional Housing Support Costs

6.17. The Additional Housing Support Costs funding available in funding instructions for financial years 2021/22 and 2022/23 has now been closed to new claims. The Flexible Housing Fund can instead be claimed by local authorities supporting a household into settled accommodation. More information is available at “Schedule 1, Part 7 – Support into Settled Accommodation: Statement of Outcomes for Flexible Housing Funding”.

6.18. Local authorities who submitted claims for Additional Housing Support Costs prior to 1 April 2023 will have their claims reviewed and administered if they meet the relevant criteria.

6.19. Where, prior to 1 April 2023, a local authority is supporting a household using Additional Housing Costs funding, they can continue to claim until year 3 of that household being in settled accommodation. The previous eligibility criteria will apply.

General

6.20. Unauthorised spends that exceed the maximum stated Funding levels at Schedule 1, 1.39 will not be reimbursed by the Authority.

6.21. In all instances, Funding received is to be pooled and managed across all the Beneficiaries supported by the relevant Recipient.

6.22. The relevant Recipient will be the single point of contact for invoicing and payments.

6.23. Any payments made under this Instruction will also cover VAT or other duties paid by the Recipient to the extent that these are not otherwise recoverable by the Recipient.

6.24. Nothing in this Instruction shall be construed as providing or permitting the total relevant benefits to exceed the statutory limit (the ‘benefit cap’) prevailing at the time of payment.

Termination or Changes to the Funding Instruction

6.25. This Funding Instruction may be amended or withdrawn by the Authority at any time and without notice. Any claims already made for which the resultant payment is being processed will be honoured, however any claims submitted after a notification of withdrawal shall be deemed as Ineligible Expenditure

7. DATA RECONCILIATION AND PAYMENTS

7.1. The Recipient shall complete applications for payment in the relevant form set out in Annex A, which includes details of each Beneficiary and the financial support applied for.

7.2. Specific instructions for the completion of Annex A are included in the LA funding Excel workbook, which will be supplied by the Authority. The form at Annex A should only be submitted via the Authority’s secure data transfer portal, “MOVEIT DMZ”, to ensure compliance with Data Protection Legislation.

7.3. Payments will be made within thirty (30) Days of receipt of a correctly completed claim.

7.4. The Annex A submitted for payment should be received by the Authority no later than three (3) Months after the close of the period to which the application relates; late returns may result in payment being delayed. The Recipient will have the opportunity to make representations if they believe that the level of Funding received is less than that to which they are entitled under the terms of this Instruction. Any discrepancies regarding the amounts paid must be notified by the relevant Recipient to the Afghan Schemes Payments Team within one (1) Month of the Annex A response being sent, following reconciliation against the Authority’s records.

7.5. At the end of the period for which support is paid, final checks will be carried out to ensure that the payments already made accurately reflect the amounts to which the Recipient is entitled. Payments made as a result of applications are to be regarded as payments on account, which will be finalised when the final claim is confirmed by the Authority. The Recipient should note that the format of the claim spreadsheets must not be altered.

7.6. Where a Recipient believes that the level of Funding actually paid by the Authority is less than that to which they are entitled under the terms of this Instruction, the Recipient may make representations to the Authority’s Funding Team. Any discrepancies must be notified to the Afghan Schemes Payments Team within one (1) Month of a payment being made. Retrospective payments by the Authority for individuals not promptly included in the Annex A claim may be agreed only where exceptional circumstances can be shown.

7.7. Payments will be made by BACS using account details that the Recipient must supply to the Authority on headed notepaper, signed by a senior finance official. The Recipient is responsible for ensuring that the Authority has been notified of its correct bank account details and any subsequent changes. The information which the Authority requires to enable a new account or change of BACS payment details is as follows:

Supplier Details

1. Registered name of company 2. Trading name of company 3. Company registration number 4. Vat registration number

Supplier Address Details

1. Registered Address 2. Credit Control/Finance Address

Contact Details

1. Email address for purchase orders 2. Email address for remittance advice 3. Email address for invoice queries 4. Telephone Number for Accounts Receivable/Credit Control

Payment Details

1. Bank Name 2. Branch name and address 3. Company Bank Account Name 4. Bank Account Number 5. Bank Account Sort Code

7.8. In the event of a change in bank details, the relevant Recipient should immediately notify the Authority of the new information. Such notification must be provided in writing, in a non-editable PDF format, and in accordance with the requirements of Clause 7.7.

7.9. The Recipient must record expenditure in their accounting records under generally accepted accounting standards in a way that the relevant costs can be simply extracted if required. Throughout the year, the Authority’s Funding team will work with the Recipient to ensure the accuracy of claims, thereby reducing the need for audits at year-end.

8. MONITORING & EVALUATION

8.1. The Recipient should itself manage and administer the quality and level of delivery relating to the support it provides to Beneficiaries.

8.2. The Recipient shall monitor the delivery and success of the Schemes throughout the Funding period to ensure that the Purpose is being met and that this Instruction is being adhered to.

8.3. The Authority will require the Recipient to provide information and documentation regarding Beneficiaries for monitoring and evaluation purposes.

8.4. This will include the provision of individual level information on Beneficiaries for the evaluation of the Schemes. The evidence form should only be submitted via the Authority’s secure data transfer portal, “MOVEIT DMZ”, to ensure compliance with UK Data Protection Legislation.

8.5. The Recipient shall provide information requested to monitor progress against the Statement of Outcomes. Visits may be made from time to time by the Authority or its appointed representatives, including the National Audit Office. Whilst there is no requirement for submission of detailed costings, the Recipient must be able to provide the costs for individual cases and will, if required, be expected to justify, explain, and evidence costs.

8.6. In all cases, to assist with monitoring and evaluation of the Schemes, the Recipient shall supply the Authority with all such financial information as is reasonably requested from time-to-time, on an open book basis.

9. BREACH OF FUNDING CONDITIONS

9.1. Where a Recipient fails to comply with any of the conditions set out in this Instruction, or if any of the events mentioned in Clause 9.2 occur, then the Authority may reduce, suspend, or withhold payments, or require all or any part of the relevant payments to be repaid by the Recipient. In such circumstances, the Recipient must repay any amount required under Clause 9.1 within thirty (30) Days of receiving the demand for repayment.

9.2. The events referred to in Clause 9.1 are as follows:

9.2.1. The Recipient purports to transfer or assign any rights, interests or obligations arising under this Agreement without the agreement in advance of the Authority, or

9.2.2. Any information provided in the application for Funding (or in a claim for payment or Exceptional Costs) or in any subsequent supporting correspondence is found to be incorrect or incomplete to the extent the Authority considers to be material, or

9.2.3. The Recipient takes inadequate measures to investigate and resolve any reported irregularity.

10. ACTIVITIES – GENERAL

Sub-contracting

10.1. When procuring works, goods, or services the Recipient must ensure that it complies with its statutory obligations, for example the Public Contracts Regulations 2015 in England, Northern Ireland, and Wales. In any event, the Recipient shall demonstrate value for money and shall act in a fair, open, and non-discriminatory manner in all purchases of goods and services to support the delivery of the Schemes.

10.2. Where the Recipient enters into a contract (or other form of agreement) with any third party for the provision of any part of the Schemes, the Recipient shall ensure that a term is included in the contract or agreement requiring the Recipient to pay all sums due within a specified period: this shall be as defined by the terms of that contract or agreement, but shall not exceed thirty (30) Days from the date of receipt of a validated invoice.

10.3. The Recipient must take all reasonable steps to ensure that anyone acting on its behalf shall not bring the Authority or the Schemes into disrepute; for instance, by reason of prejudicing and/or being contrary to the interests of the Authority and/or the Schemes.

Hours of Operation

10.4. The Recipient shall note that the Authority performs normal business during the hours of 09.00 to 17.00 on Working Days.

10.5. The Scheme shall be provided at a minimum on each Working Day. The Authority recognises that in the interests of efficiency the exact availability and timings of the various service elements will vary. It is envisaged that some out of hours provision will be required from the Recipient.

10.6. All premises used to deliver the Schemes elements should meet all regulatory requirements and be suitable for the purpose.

Complaints

10.7. The Recipient and/or its Delivery Partners shall develop, maintain, and implement procedures enabling Beneficiaries to complain about the support and assistance provided by the Recipient.

Staff Standards

10.8. At all times whilst delivering the Schemes the Recipient shall be mindful of the intent, and apply the spirit, of the UK Government’s “Code of Conduct for Recipients of Government General Grants”[footnote 4] which outlines the standards and behaviours that the government expects of all its Delivery Partners.

10.9. The Recipient shall:

10.9.1. ensure that the recruitment, selection, and training of Staff, are consistent with the standards required for the performance of the outcomes,

10.9.2. fully equip and train Staff to ensure they are able to fulfil their roles and ensure that appropriate and sufficient security provisions are made for all Staff undertaking face-to-face activities,

10.9.3. ensure that Staff levels are appropriate at all times for the purposes of delivering the Schemes and ensure the security and well-being of all Beneficiaries, dependent children, and its Staff,

10.9.4. take all reasonable steps to ensure that they and anyone acting on their behalf shall possess all the necessary qualifications, licences, permits, skills, and experiences to discharge their responsibilities effectively, safely and in conformance with all relevant law for the time being in force (so far as binding on the Recipient), and

10.9.5. ensure that it has relevant organisational policies in place to deliver the activities funded by this Instruction. These shall remain current for the duration of this Instruction and be reviewed regularly by appropriate senior Staff. All Staff must be aware of these policies and of how to raise any concerns.

10.9.6. that all applicants for employment in connection with the Schemes are obligated to declare on their application forms any previous criminal convictions subject always to the provisions of the Rehabilitation of Offenders Act 1974.

10.10. In addition, the Recipient shall ensure that all Staff:

10.10.1. employed or engaged have the right to work in the United Kingdom under applicable immigration law, and

10.10.2. are suitable and of good character to provide support to Beneficiaries. Consideration must be given to eligibility for Disclosure and Barring Service (DBS2) checks. Where such checks reveal prior criminal convictions that might reasonably be regarded as relevant to the appropriateness of the individual to have unsupervised access, particularly to children under the age of 18, or where such checks are not possible because of identification issues, the Recipient shall follow its internal policy and carry out an appropriate risk assessment before an offer of employment is made, and

10.10.3. who are likely to have unsupervised access to children under the age of 18 have been instructed in accordance with the relevant national child protection guidelines e.g. for people working in England, DfE’s Working Together to Safeguard Children, 2015, and Local Authority’s guidance and procedures, and

10.10.4. providing immigration advice should be known to the Office of the Immigration Services Commissioner (OISC) in accordance with the regulatory scheme specified under Part 5 of the Immigration & Asylum Act 1999. The Recipient shall use all reasonable endeavours to ensure that its Staff do not provide immigration advice or immigration services unless they are “qualified” or “exempt” as determined and certified by OISC.

10.10.5. apply safeguarding responsibilities and obligations for as long as personnel, including volunteers, have formal involvement with the local authority in delivering resettlement and integration services to the Beneficiary.

10.11. The Recipient shall, on request, provide the Authority with details of all Staff delivering the Schemes.

10.12. The Recipient shall, on request, provide the Authority with CVs and/or job descriptions for all Staff selected to work on the project.

10.13. The Recipient shall use all reasonable endeavours to comply with the requirements of the Computer Misuse Act 1990.

10.14. The Recipient shall implement the Schemes in compliance with the provisions of UK Data Protection Legislation.

11. LIABILITY

11.1. The Authority accepts no liability to the Recipient or to any third party for any costs, claims, damage, or losses, however they are incurred, except to the extent that they are caused by the Authority’s negligence or misconduct.

12. DISPUTE RESOLUTION

12.1. The Parties shall attempt in good faith to negotiate a settlement to any dispute between them arising out of or in connection with this Instruction.

12.2. The Parties may settle any dispute using a dispute resolution process which they agree.

12.3. If the Parties are unable to resolve a dispute in line with the requirements of Clauses 12.1 or 12.2, the dispute may, by agreement between the Parties, be referred to mediation in accordance with the Model Mediation Procedure issued by the Centre for Effective Dispute Resolution (“CEDR”), or such other mediation procedure as is agreed by the Parties. Unless otherwise agreed between the Parties, the mediator will be nominated by CEDR. To initiate the mediation, the Party shall give notice in writing (the ADR Notice) to the other Party, and that latter Party will choose whether or not to accede to mediation. A copy of the ADR Notice should be sent to CEDR. The mediation will start no later than ten (10) Working Days after the date of the ADR Notice.

12.4. The performance of the obligations which the Recipient has under this Instruction will not cease or be delayed because a dispute has been referred to mediation under Clause 12.3 of this Instruction.

13. INTELLECTUAL PROPERTY RIGHTS (IPRS) AND BRANDING

13.1. The Parties shall retain exclusivity in their own Background IPRs.

13.2. Unless otherwise agreed In Writing, the Recipient shall own all IPR created using the Grant. However, the Recipient shall grant to the Authority at no cost a non-exclusive irrevocable, royalty-free perpetual worldwide license to use and to sub-license the use of any material or IPR created by the Recipient whether partially or wholly funded from the Grant for such purposes as the Authority shall deem appropriate.

13.3. Ownership of Third Party software or other IPR necessary to deliver the Purpose will remain with the Recipient or the relevant Third Party.

13.4. Neither Party shall have the right to use any of the other Party’s names, logos, branding or trademarks on any of its products or services without the other Party’s prior written consent.

13.5. The Recipient shall at all times during and following the end of the Funding Period:

13.5.1 comply with requirements of the Branding Manual in relation to the Purpose; and

13.5.2 cease use of the Funded by UK Government logo on demand if directed to do so by the Authority

13.6. The Recipient shall seek approval from the Authority prior to using the Authority’s logo when acknowledging the Authority’s financial support of its work. Such acknowledgements (where appropriate or as requested by the Authority) shall include the Authority’s name and logo (or any future name or logo adopted by the Authority) using the templates provided by the Authority from time to time.

13.7. When using the Authority’s name and logo, the Recipient will comply with all reasonable branding guidelines as issued by the Authority from time-to-time.

13.8. The Authority may freely share any information, branding, know-how, system or process developed using the Grant during the Funding Period and beyond to support similar or subsequent schemes.

14. SOCIAL VALUE REQUIREMENTS

14.1. The Recipient shall be mindful of and take reasonable measures to ensure that all its activities in delivering the Purpose support the UK Government’s commitment to Social Value by:

14.1.1 fighting climate change in compliance with the UK Government’s “Greening Government Commitments” including the need to avoid adverse impacts on the environment and contributing to the Net Zero by 2050 ambition,

  • conserving energy, water, wood, paper and other resources,

  • reducing waste,

  • reducing fuel emissions wherever possible,

  • phasing out the use of ozone depleting substances and minimise the release of greenhouse gases, volatile organic compounds and other substances damaging to health and the environment, and

  • having due regard to the use of recycled products, so long as they are not detrimental to the provision of the Purpose or the environment, to include the use of all packaging, which should be capable of recovery for re-use or recycling.

14.1.2 tackling economic inequality through the creation of new businesses, new jobs and new skills, increasing supply chain resilience and capacity, quality apprenticeship schemes, ending the gender pay imbalance, prompt payment throughout its commercial arrangements, and ensuring opportunities for SMEs and Civil Society and those owned or led by protected characteristics, and

14.1.3 supporting equal opportunity and wellbeing by reducing the disability employment gap, tackling workforce inequality, improving health and wellbeing, and improving community integration, and

14.1.4 safe and secure supply chains free from modern slavery and human trafficking through inspection and audit, use of the Modern Slavery Assessment Tool, assessing and recording risks, and supply-chain mapping.

15. CONTACT DETAILS

For queries relating to this Instruction or the submission of payment applications, please email the Resettlement Local Authority Payments team at

[email protected]

SCHEDULE 1: POST-ARRIVAL RESETTLEMENT SUPPORT

1. PART 1 – YEAR 1 STATEMENT OF OUTCOMES

Provision of accommodation

1.1 The Recipient will arrange accommodation for those Beneficiaries they are supporting which:

1.1.1 meets local authority standards, and

1.1.2 will be available on their arrival and/or relocation to the local authority area, and

1.1.3 is affordable and sustainable.

1.2 The Recipient will ensure that the accommodation is furnished appropriately. The Funding should not be used to procure luxury items: This means that Funding received should be used for food storage, cooking, and washing facilities but should not include the provision of other white goods or brown goods, i.e., TVs, DVD players or any other electrical entertainment appliances. This shall not preclude the Recipient from providing Beneficiaries with additional luxury, white or brown goods through other sources of funding.

1.3 The Recipient shall ensure that the Beneficiary is registered with utility companies and ensure that arrangements for payments are put in place (no pre-pay coin or card meter accounts)[footnote 5].

1.4 The Recipient will provide briefings on the accommodation and health and safety issues for all new arrivals including the provision of an emergency contact point.

1.5 Recipients can make use of the private rented sector and Ministry of Defence Service Family Accommodation for suitable offers of accommodation. Any expenditure incurred from the tariff for this purpose must meet similar thresholds of due diligence to ensure the effective use of public funds. Flexible use of the funding to enable private rented sector procurement may include but is not limited to:

• Deposits

• Landlord incentives

• Letting fees

• Necessary furnishings

1.6 No funding will be available to local authorities above the amounts set out in the Tariff and existing Funding Instructions, but local authorities are encouraged to allocate this flexibly and as they see fit to make use of all accommodation options. Local authorities will be expected to deliver on all the elements as set out in the Statement of Outcomes and are encouraged to proportion expenditure sensibly.

Find Your Own Accommodation

1.7 Where the Recipient supports Beneficiaries to find their own accommodation in the private rented sector (via the Find Your Own Accommodation pathway) they need to ensure that points 1.1 to 1.6 of this Schedule are met. There is an expectation for receiving local authorities to make reasonable efforts to ensure private rented accommodation found by Beneficiaries meets reasonable local authority standards, is safe, sustainable and in reasonable condition; and that all families looking for their own accommodation have sufficient guidance to enable them to consider the property’s relevant standards.

1.8 The Recipient should engage with the bridging local authority (where applicable) to confirm what type of support will need to be provided to the Beneficiary. Local authorities should endeavour to follow the principles in the Find Your Own Accommodation Working Protocol circulated on 26 April 2023.

1.9 In the instances, mentioned in 1.1 and 1.8, the Recipient should agree to provide full integration support for 36 months to the Beneficiary to enable the Recipient to have access to this funding.

Initial Reception Arrangements

1.10 Transport arrangements to accommodation will vary depending on whether any Beneficiary is arriving directly from abroad or whether they are in a bridging hotel. Where appropriate the Recipient will meet and greet all Beneficiaries arriving from the relevant airport and escort them to their accommodation. In other circumstances, transport to their accommodation will be arranged by the Authority. When Beneficiaries arrive at their accommodation, they should be provided with a briefing on how to use the amenities.

1.11 The Recipient will ensure that all Beneficiaries are provided with a welcome pack of groceries on their arrival – the content of this pack should consider the culture and nationality of the Beneficiary(s).

1.12 Included in the annual tariff is provision for the Recipient to provide an initial cash allowance for each Beneficiary of £200 – this is to ensure they have sufficient funds to live on while their claim for benefits is processed. If any Beneficiary is already in receipt of mainstream benefits this initial cash allowance should not be provided. Where a Beneficiary is resettled in an area in which Universal Credit has been implemented, the Recipient may provide an additional one-off payment of up to £100 for each Refugee, if required. This should be claimed as an Exceptional Cost on the initial Annex A claim.

Casework Support

1.13 The Recipient should ensure that all Beneficiaries are provided with a dedicated source of advice and support to assist with registering for mainstream benefits and services, and signposting to other advice and information giving agencies. This support includes:

1.13.1 Assisting with the distribution of Biometric Residence Permits (BRP) cards following arrival. For any Beneficiary coming from overseas, the Recipient shall distribute BRP cards. This will exclude those in bridging hotels who will already have their BRP cards.

1.13.2 Registering with local schools, or if Adults, English language, and literacy classes (see paragraphs 1.26 - 1.36 of this Schedule), or other appropriate training.

1.13.3 Attending local Job Centre Plus appointments for benefit Assessments (where necessary),

1.13.4 Registering with a local GP, and other healthcare providers in line with identified medical needs,

1.13.5 Advice around and referral to appropriate mental health services and to specialist services as appropriate,

1.13.6 Providing assistance with access to employment.

1.14 The Recipient shall develop an overarching (or framework) integration support plan and bespoke integration support plans for each family or individual/Beneficiary for the first twelve (12) Month period of their support to facilitate their integration and orientation into their new home/area. The plan should consider the varying needs of individuals within households and how to support these needs and the needs of individuals on the basis of their characteristics.

1.15 Throughout the period of resettlement support the Recipient shall ensure interpreting services are available. Any additional interpreting costs incurred, for example attendance at Job Centre Plus or Healthcare appointments, may be claimed as an Exceptional Cost, subject to the prior approval of the Authority.

1.16 The above outcomes will be provided through a combination of office-based appointments, drop-in sessions, outreach surgeries and home visits (virtual or in person).

1.17 The Recipient shall collate such casework information as is agreed to enable the Authority to monitor and evaluate the effectiveness of the Schemes’ delivery.

1.18 Where Beneficiaries are not accessing key services, including where needs based on protected characteristics may not be met or where Recipients are otherwise concerned about the welfare of Beneficiaries or their dependants, Recipients are asked to contact their regional contact officer.

Requirements for Beneficiaries with special needs/assessed community care needs

1.19 In order to facilitate a Recipient’s need to make additional arrangements, such as property adaptations (see also Annex D), for each Beneficiary identified as potentially having special needs/community care needs, the Authority will ensure, as far as possible, that these needs are clearly identified and communicated to the Recipient a minimum of forty-two (42) Days prior to the arrival in the UK of each Beneficiary. Where Beneficiary are already residing in temporary accommodation in the UK, this information will be communicated to the Recipient as soon as practicable to enable necessary arrangements to be made.

1.20 Where special needs/community care needs are identified only after arrival, the Recipient will use best endeavours to ensure that care is provided by the appropriate mainstream services as quickly as possible.

1.21 Where sensitive issues (including safeguarding issues or incidents of domestic abuse, violence, or criminality) are identified by the Authority, the Authority will notify the Recipient immediately, and no longer than one (1) Day, after receipt of the information.[footnote 6]

Provision of Education for U18s

1.22 The Recipient has a statutory duty for ensuring educational places are available for children of school age.

1.23 To support the Recipient in achieving this obligation, the Authority will pay Funding in respect of any Beneficiary aged between 3 and 18 years (including those ACRS Beneficiaries brought in under the Community Sponsorship Scheme) to meet the:

1.23.1 provision of education in state-funded establishments; and

1.23.2 Recipient’s statutory obligations regarding the assessment of Special Educational Needs & Disabilities (SEND), in respect of which the costs of the assessment will also be met on a case-by-case basis.

1.24 The Recipient shall be responsible for ensuring that the appropriate level of funding is paid to places of education (including schools, academies, free schools, and Further Education colleges, as appropriate) who accept Beneficiaries from the relevant age groups.

1.25 Further additional payments may also be made in order to cover necessary Exceptional Costs of social care, where compelling circumstances exist. These will be assessed and made on a case-by-case basis.

English Language Provision for Adult Beneficiary

1.26 The purpose of language training is to ensure that each Adult Beneficiary is able to progress towards the level of proficiency needed to function in their everyday life; to promote integration; and to support those resettling in the UK to progress towards self-sufficiency, including accessing services or joining the workforce.

1.27 The Recipient shall undertake an assessment of each Adult Beneficiary’s English language capability to determine their training needs; this assessment should take place at the earliest opportunity. The Adult Beneficiary should be made aware of their assessment level. The assessment should determine whether Formal Language Training is appropriate, and where Informal Language Training should be used to complement, or as a foundation for, Formal Language Training. As a minimum, Adult Beneficiaries should be able to access conversational practice to consolidate/complement their Formal Language Training.

1.28 If Formal Language Training is deemed appropriate according to their assessment, the Adult Beneficiary should be able to access a minimum of eight (8) hours per week within one (1) Month of arrival or, for those already in the UK, at the start of Recipient support. This should be provided to Adult Beneficiaries until they have reached Entry Level 3 or for at least twelve (12) months after the start of Recipient Support (whichever is the sooner).

1.29 Different Adult Beneficiaries will face different barriers to participating in Formal Language Training depending on their unique circumstances. There is, therefore, not a singular uniform activity that this Funding should be used for. Instead, the Recipient’s use should be informed by the nature of existing local provision and by each Adult Beneficiary’s specific circumstances and requirements. Possible activities include but should not be limited to:

1.29.1 Funding payments for mainstream Formal Language Training.

1.29.2 Commissioning discrete Formal Language Training classes for Adult Beneficiaries or funding advanced levels of ESOL for those that have a higher level of English language proficiency.

1.29.3 Supporting the delivery of the minimum eight (8) hours provision per week (Part 1, paragraph 1.28 of this Schedule 1).

1.29.4 Language training or preparation for language proficiency tests supporting access to employment, further education, or higher education.

1.29.5 Commissioning classes at the level which faces the greatest pressure in the area with the agreement that some of the Adult Beneficiaries attend – along with other students – and with the agreement that the additional capacity created allows Adult Beneficiaries at other levels to attend mainstream classes.

1.29.6 Funding evening and weekend classes.

1.29.7 Funding online resources and/or provision to complement face-to-face services, enabling Beneficiaries to access a variety of ESOL support that best meets their requirements.

1.30 The Funding is prioritised for participation in ESOL provision. However, if there is a lack of available provision, up to 25% of the Funding can be spent to increase ESOL infrastructure, and therefore future participation rates, where deemed absolutely necessary. ESOL infrastructure could include, for example, training ESOL teachers, buying equipment and resources and renting classroom space. The Recipient will be expected to report back on the proportion of spend on ESOL infrastructure.

1.31 For some Adult Beneficiaries, attending Formal Language Training will be more challenging than for others. For example, they might have caring responsibilities, a disability or find attending Formal Language Training difficult. In these instances, it is important that steps are taken to address these barriers so 25% of the ESOL infrastructure element of the Funding (as set out in para 1.30) can be used to support activities that help overcome accessibility barriers [childcare funding should be claimed separately, as described at Part 5].

1.32 The Recipient, however, should look to utilise other local or central funding sources or services, wherever possible.

1.33 In instances where Adult Beneficiaries arrive outside term time, making immediate access to Formal Language Training difficult, alternative Informal Language Training should instead initially be provided within one (1) month of arrival.

1.34 The provision of Informal Language Training is also a suitable alternative in instances where a Beneficiary is assessed as being at pre-entry ESOL level or finds a Formal Language Training environment a barrier to accessibility, which cannot be resolved using the infrastructure funding set out in paragraph 1.30.

1.35 In such instances as set out at paragraphs 1.27 and 1.28, the Recipient should encourage the Adult Beneficiary to access Formal Language Training in the future. This is because Informal Language Training cannot provide accredited qualifications which are often necessary for accessing employment, further study, or training.

1.36 An additional amount of Funding is also available to Recipients, to increase Adult Beneficiary access to Language Training appropriate to their ability and needs. This is outlined in Part 4 of this Schedule 1. This is a single payment to be claimed within the first 12 months of arrival or, for those already in the UK, at the start of Recipient support.

Delayed and Cancelled Arrivals

1.37 In the event of a delayed arrival, the Recipient can claim void rent costs incurred until arrival. The Recipient should be aware that the tariff has been calculated to pay for a period of void costs. To reflect this, fifty-six (56) days void costs are already built into the tariff to enable Recipients to secure properties before beneficiaries arrive.

1.38 In the event of a cancelled arrival funding will be available for those incurring costs (e.g., for void rent costs and set up) for cancelled arrivals if the property/ies cannot be used for another beneficiary. The Authority will accept claims for void costs for the property/ies concerned. Void costs will be considered:

  • From the date that you became liable for the rent or the date that the property was formally offered to the Authority (whichever later),

  • To the date the Authority email notifying you to release the property, or

  • In cases where you have already advised the Authority that you could no longer hold the property/ies, void costs will be considered to the date of that notification.

Funding and Claims Process

1.39 The Authority agrees to provide Funding as a contribution to the Recipient’s eligible expenditure in delivering the outcomes described in Part 1 of this Schedule 1 (paragraphs 1.1 to 1.25, inclusive), on a standard per capita per annum rate for each Beneficiary as follows:

YEAR 1 UNIT COSTS[footnote 7]

Adult Benefit Claimant Other Adults Children 5-18 Children 3-4 ChildrenU-3
Local Authority Costs 10,500 10,500 10,500 10,500 10,500
Education 0 0 4,500 2,250 0
TOTALS 10,500 10,500 15,000 12,750 10,500

1.40 Payments will be based on the age of the Beneficiary on arrival in the Recipient’s area.

1.41 Once these maxima have been reached, no further funding will be paid by the Authority to a Recipient save for any claims made in respect of Exceptional Costs (see Terms & Conditions, Clauses 6.12 and 6.13).

1.42 On the Day the Recipient commences the provision of support at set out in this Funding Instruction, the Recipient will be eligible to claim 40% of the total projected annual per capita amount for that person. The Recipient must make a claim on the relevant standard claim form (Annex A).

1.43 The remainder will be due in two equal instalments at the end of the fourth (4th) and eighth (8th) Months following the Beneficiary’s arrival in the UK.

1.44 The per capita tariff includes an element for the Recipient to cover up to fifty-six (56) Days (i.e., eight weeks) of void costs. The process for claiming additional/exceptional void costs is explained in Annex E.

1.45 Funding received is to be pooled and managed across all those identified as supported by the relevant Recipient.

1.46 Additional funding to meet the Recipient’s SEND responsibilities for any Beneficiary will be met by the Authority on a case-by-case basis as an Exceptional Cost.

1.47 Where compelling circumstances exist, the Recipient may request additional funding for educational purposes in respect of any Beneficiary who is 18 years or younger and who is in full-time education. Such requests will be considered on a case-by-case basis, as an Exceptional Cost, with the final decision on payment, duration, and rate (which may be adjusted from time to time) to be set by the Authority.

1.48 In submitting a claim under this Funding Instruction, the Recipient is confirming they have to the best of its knowledge and belief, submitted true and accurate information.

2. PART 2 – YEAR 2 TO 3 STATEMENT OF OUTCOMES

Year 2 – 3 Funding

2.1 Year 2 – 3 Funding is intended as a contribution towards a Recipient’s costs incurred supporting a Beneficiary’s continued participation in the Schemes.

2.2 To maximise flexibility, it will be for the Recipient to determine the best use of Funding claimed to support the Beneficiary on their journey towards integration and self-sufficiency. Support should be in line with the person-centred integration goals identified in the personalised integration support plan and should include (but not be limited to) ongoing integration into the communities into which a Beneficiary has been resettled; progress towards and into employment (which may include tailored employment support and sector specific formal or informal language training); social care costs for adults and children; or additional educational support. Support should be tailored and particularly consider how to best support the Beneficiary with particular barriers to integration as well as having due regard to protected characteristics.

2.3 The Recipient should be able to explain how they are supporting the Beneficiary and furthering the aims of the Schemes by documenting the type(s) of support provided. This should be done with reference to the individual’s personal integration plan and goals.

Funding and Claims Process

2.4 The Recipient may claim Funding from the first anniversary (i.e., 12 Months) following the commencement of the provision of support under the Schemes, and for subsequent years until the end of the third year.

2.5 The key principles of the Funding are that it:

2.5.1 provides a per Beneficiary annualised tariff (see table 2.6),

2.5.2 is not ringfenced,

2.5.3 supports programme evaluation and reporting, and

2.5.4 can be pooled across all Beneficiaries that a Recipient is supporting.

2.6 A maximum of two (2) annual flat rate payments may be claimed by a Recipient for each Beneficiary supported:

YEAR 2 TO 3 - UNIT COSTS [footnote 8]
Timeframe 13-24 months 25-36 months
Tariff £6,000 £4,020

2.7 The Authority will only approve one claim per Beneficiary per annum.

2.8 No further Funding will be paid by the Authority to a Recipient apart from for any claims made in respect of Exceptional Costs (see Terms & Conditions, Clauses 6.12 and 6.13).

2.9 All claims for Year 2 – 3 Funding must be submitted during the second financial quarter (i.e., from 1 July, but in all cases by 30 September) in the same year: late returns may result in payment requests being delayed or refused. Payment will only be made to recipients for all Beneficiaries who are resident in the local authority area on the date of 30 September. If the Beneficiary is not resident on that date, then payment will be refused. Once satisfied that a payment request has been correctly submitted, the Authority will endeavour to make payments of Funding due during the third quarter of the same financial year (i.e., from 1 October, but no later than 31 December).

2.10 Funding will be by means of a single annual payment to be claimed at the times as detailed in the following table:

YEARS 2-3 FUNDING – PAYMENT PROFILE FOR ACRS & ARAP ARRIVALS  
Arrivals into the support of the Local Authority between Claim funding for Year 2 Claim funding for Year 3
22/06/2021 to 21/06/2022 21/06/2023 21/06/2024
22/06/2022 to 21/06/2023 21/06/2024 21/06/2025

2.11 In submitting a claim under this Funding Instruction, the Recipient is confirming they have to the best of its knowledge and belief, submitted true and accurate information.

3. PART 3 –STATEMENT OF OUTCOMES FOR RECIPIENTS IN RELATION TO COMMUNITY SPONSORSHIP FOR ACRS BENEFICIARIES ONLY

3.1 A key aspect of the Community Sponsorship Scheme (the ‘Schemes’) is the requirement for each approved Sponsor to have the support of their relevant statutory authorities, including the Recipient.

Reimbursement for Education Costs

3.2 In accordance with their statutory duty, a Recipient shall be entitled to claim Funding towards educational costs incurred supporting children of school age up to the following maximum per capita rates:

UNIT COSTS (£GBP) FOR SCHEMES[footnote 9]

Adult Benefit Claimant Other Adults Children 5-18 Children 3-4 Children U-3
YEAR 1 Education 0 0 4,500 2,250 0

3.3 The Recipient shall be responsible for ensuring that the appropriate level of funding is paid to places of education (incl. schools, academies, free schools, and Further Education colleges, as appropriate) who accept Beneficiaries from the relevant age groups.

3.4 The Recipient may request additional funding for educational purposes in respect of all supported Beneficiaries who are 18 years or younger and who are in full-time education, where compelling circumstances exist. Such requests will be considered on a case-by-case basis, with the final decision on payment, duration, and rate (which may be adjusted from time to time) to be set by the Authority.

Reimbursement for other Support Costs during Years 1 and 2

3.5 If, for any reason, a Sponsor is unable to fulfil its obligations in delivering the Afghan Citizens Resettlement Scheme (ACRS), the Recipient will be required to step-in and provide the necessary support through:

3.5.1 The first twelve (12) Months (Year 1), including the provision of accommodation, casework support, education (incl. Language Training), and social care, as described in Part 1 of this Schedule, and

3.5.2 The second twelve (12) Months (Year 2), the provision of accommodation and any other support as the Recipient deems appropriate, as described in Part 2 of this Schedule.

3.6 Where a Sponsor becomes unable to fulfil their contractual obligations, or otherwise support those resettled under the ACRS and their immediate dependants, a Recipient may also be eligible to claim Funding for each person supported up to the following maximum standard per capita rates:

UNIT COSTS (£GBP) FOR SCHEMES[footnote 10]

Adult Benefit Claimant Other Adults Children 5-18 Children 3-4 Children U-3
YEAR 1 Resettlement Costs 10,500 10,500 10,500 10,500 10,500
YEAR 2 Resettlement Costs 6,000 6,000 6,000 6,000 6,000

3.7 It is recognised that a Sponsor may already have fulfilled some of their obligations with respect to an individual or family’s support requirements. It will, therefore, be for the Recipient to assess and determine each person’s needs against the outcomes described in Part 1 and Part 2 of this Schedule 1.

3.8 The exact value of the Funding and timing of the payment will be determined on a case-by-case basis depending on the circumstances of each person for whom the Recipient is claiming.

3.9 Funding up to the maxima noted will be dependent on the length of time for which the Recipient is required to provide support for the individual or family. Typically, this will be:

3.9.1 More than six (6) Months – full value

3.9.2 Less than six (6) Months – 50% of the value

Funding for Year 3

3.10 A Recipient will be eligible to claim for contributions to costs under the relevant time periods described in Part 2 of this Schedule 1, to be determined on a case-by-case basis.

4. PART 4 – ACCESS TO ESOL: STATEMENT OF OUTCOMES FOR ADDITIONAL FUNDING TO SUPPORT ENGLISH LANGUAGE PROVISION FOR ADULT BENEFICIARIES

Increasing Access to Language Training

4.1 As noted in Part 1, paragraph 1.30 of this Schedule 1, the additional Funding available is primarily intended to increase any Adult Beneficiary access to Formal Language Training appropriate to their ability and needs.

4.2 It can also be used to support Informal Language Training (Part 1, paragraph 1.27 of this Schedule 1).

4.3 In line with existing good practice guidance on resettlement, it is intended that this Funding be used in a way that promotes integration and the journey towards self-sufficiency.

Key Performance Indicators

4.4 The Authority has designed a set of indicators to assess the effectiveness of the Funding in achieving its outcome. These Critical Success Factors are:

4.4.1 payments received,

4.4.2 split of spend on participation and spend on non-participation (detailed in Part 1, paras 1.30 -1.31 of this Schedule)

4.5 In addition, Recipients should report on the following:

4.5.1 To what extent has the Funding increased local capacity to deliver ESOL. Have there been any delivery barriers which this Funding has not been able to overcome?

4.5.2 To what extent has the Funding improved access to ESOL. Have there been any accessibility barriers which this funding has not been able to overcome?

4.5.3 To what extent has the funding helped improve Adult Beneficiaries’ integration and progress towards self-sufficiency, including in the workplace?

4.6 The Recipient will be expected to report on these success measures through the annual End of Year monitoring process.

Funding and Claims Process

4.7 A per capita payment may be claimed for each Adult Beneficiary provided with language training by the Recipient at the following standard rate:

Unit Costs (£GBP)[footnote 11] (see para 4.11 below)
Adult Beneficiary (aged 19+ at the start of Recipient support) £850 – claim when Recipient support commences
Adult Beneficiary (aged 18+ at the start of Recipient support) £850 – claim once Beneficiary attains 19 years

4.8 Community Sponsors will claim these per capita payments for those identified as Beneficiary under the ACRS that they support.

4.9 A Recipient may ‘pool’ any Funding claimed, at a local or regional level, to maximise its ability to effectively identify individuals’ language training requirements, be responsive to these needs through the most appropriate delivery arrangements and range of providers within a local area.

4.10 Following a Beneficiary being assessed as eligible (Part 1, paragraph 1.27 of this Schedule 1) the Recipient will be able to submit a claim.

4.11 The Recipient must make a claim on the relevant standard claim form (Annex A) to receive payment. ESOL should be inserted in column O of the Annex and the standard tariff of £850 inserted in column P against each Beneficiary for whom the Funding is being claimed.

4.12 Claims for the £850 additional ESOL funding may be claimed for each Adult Beneficiary who, on the start of Recipient support, is 19 years+ or reaches the age of 19 years within the first 12 months of that support.

4.13 In submitting a claim under this Funding Instruction, the Recipient is confirming they have to the best of its knowledge and belief, submitted true and accurate information.

5. PART 5 – ACCESS TO ESOL: Statement of Outcome for funding proposals to address barriers to access, in particular childcare support

Outcomes

5.1 The Authority recognises that Refugees face barriers to participating in Formal Language Training including childcare and other caring responsibilities, the ability to combine employment with Formal provision and the need for transportation.

5.2 Delays in starting to learn English upon arrival make it more difficult for a Beneficiary (in particular, women with families) to integrate and become self-sufficient. Removing this barrier is a key to assisting any Beneficiary effectively settling into their new community.

5.3 The Authority is making Funding available to help Recipients, whether receiving authorities, Community Sponsors and/or regional co-ordination bodies (i.e., Strategic Migration Partnerships), across the UK to address this problem.

5.4 The Authority agrees to provide Funding as a contribution to the Recipient’s eligible expenditure to overcoming barriers to enable the Beneficiary to participate in ESOL training.

5.4 Access to the Funding will require potential Recipients to submit proposals for projects using the application form which can be obtained from [email protected]

5.5 Projects could provide:

5.5.1 traditional forms of childcare such as crèches or playgroups, or

5.5.2 tailored childcare on the same site as ESOL classes, or

5.5.3 innovative approaches such as providing family learning events to help adults learn English when they are unwilling or unable to leave their children. Family learning projects must meet the twin requirements of catering for children and providing language training to adults, or.

5.5.4 mobile provision to bring lessons closer to learners unable to attend mainstream provision. This could be in greater proximity to Refugees’ homes, childcare and other care providers, employment and/or in a location that is better connected to existing public transport routes, or.

5.5.5 transport that is not already offered by the Department for Transport, local authorities or other funding streams.

5.6 This list at paragraph 5.6 is not exhaustive. Further guidance on Eligible and Ineligible expenditure can be provided by the Authority on request.

Funding and Claims

5.7 To ensure a fair distribution of funds, bids will be assessed by the Authority against criteria related to identification of need and outcomes. The Authority will communicate details of the bidding process to Local Authorities, SMPs and Community Sponsorship groups at the start of the financial year. Further bids can be made on a quarterly basis during the financial year. Please be aware that once the maximum funding available has been allocated then no further funding will be available.

5.8 Details of the assessment criteria and how to bid for ESOL childcare can be obtained from [email protected]

Maximum UK-wide Funding available for Access to ESOL (Childcare) projects in 2023/24[footnote 12]

Access to ESOL childcare funding:

ACRS - £600,000

ARAP - £600,000

Key Performance Indicators

5.9 The Authority has designed a set of indicators to assess the effectiveness of the Funding in achieving its outcome.

5.10 Recipients should report on the following:

5.10.1 Total number of adults supported to access ESOL due to this funding. 0

5.10.2 Lessons learned as to the effectiveness of the project, and any recommendations for further measures to increase ESOL participation.

5.11 The Recipient will be expected to report on these success measures through the annual End of Year monitoring process. The Authority may also request additional monitoring and evaluation information outside of this process, including for instance case studies illustrating how it has been beneficial on an individual basis.

5.12 If you have any questions about this funding stream, please contact: [email protected]

5.13 In submitting a claim under this Funding Instruction, the Recipient is confirming they have to the best of its knowledge and belief, submitted true and accurate information.

6. PART 6 – COMMUNITY SPONSORSHIP ACCESS TO FUNDING

Reimbursement for Additional Funding to Support English Language Provision for Adult Beneficiaries under Afghan Citizens Resettlement Scheme (ACRS)

6.1 Community Sponsors can claim Additional Funding to support English Language provision for Adult Beneficiaries resettled under the ACRS as per Part 4, paras 4.7 to 4.13 of this Schedule.

UNIT COSTS (£GBP) FOR SCHEMES
Adult Beneficiary (aged 19+ at the start of support by the Community Sponsor group) £850 – claim when Community Sponsorship support commences
Adult Beneficiary (aged 18+ at the start of support by the Community Sponsor group) £850 – claim when Community Sponsorship support commences

6.2 Claims for the £850 additional ESOL funding may be claimed for each Adult Beneficiary resettled under the ACRS who, on the start of Recipient support, is 19 years+ or reaches the age of 19 years within the first 12 months of that support.

6.3 Community Sponsors may also bid for the funding available for childcare to facilitate participating in Formal Language Training activity, as set at in Part 5 of this Schedule 1.

6.4 In submitting a claim under this Funding Instruction, the Recipient is confirming they have to the best of its knowledge and belief, submitted true and accurate information.

7. PART 7 – SUPPORT INTO SETTLED ACCOMMODATION: STATEMENT OF OUTCOMES FOR FLEXIBLE HOUSING FUNDING

Outcomes

7.1. The £7,100 Flexible Housing Funding is available to help the Recipient source settled accommodation or support a Beneficiary to secure settled accommodation at the earliest opportunity. It can be used flexibly by the Recipient, who will be free to determine how best to use the Funding. For the purposes of this Funding, settled accommodation is defined as accommodation that meets local authority standards and is deemed suitable and sustainable.

7.2. For Beneficiaries who were in bridging accommodation between 1 April 2023 and 31 August 2023, funding can be claimed by the Recipient (be that the bridging hotel Local Authority or the receiving Local Authority) to move Beneficiaries from bridging hotels or Temporary Accommodation into appropriate settled accommodation. This may include, but is not limited to, Private Rented Sector properties (PRS identified through Find Your Own Accommodation), matched properties, Service Family Accommodation or Barratt properties.

7.3. For Beneficiaries who arrived in the UK between 1 September 2023 and 31 March 2024 funding is capped at £35,000 per household. The Recipient can claim this funding to move Beneficiaries from transitional accommodation (and where applicable Ministry of Defence reception sites) or Temporary Accommodation into appropriate settled accommodation. This may include, but is not limited to, helping a Beneficiary find their own Private Rented Sector accommodation or to match LAHF properties (rounds 1 and 2 only).

7.4. For arrivals from 1 September 2023, funding cannot be claimed where the Beneficiary has moved into accommodation provided by sponsor groups under the Communities for Afghans scheme, PRS leased by Mears or Service Family Accommodation. For the ARAP scheme, funding can only be claimed where the Beneficiary does not have a suitable match to, or has refused, accommodation allocated by the Ministry of Defence, therefore council support is needed to move the Beneficiary into alternative settled accommodation.

7.5. For monitoring and evaluation purposes the Recipient must be able to demonstrate that the Funding has been used to support Beneficiaries to move into appropriate settled accommodation.

7.6. Uses for this funding may include (but are not limited to):

7.6.1. Support to access the Private Rented Sector (for example via the Find Your Own Accommodation Pathway), including (but not limited to):

  • Landlord incentives (such as upfront rent payments)

  • Support with rent guarantees

  • Deposits

  • Initial rent, or ongoing rental top-ups where required.

  • Furnishings

7.6.2. Support the Beneficiary with advice and guidance on tenancy sustainment, for example providing information on how to set-up bills and property up-keep.

7.6.3. Resource support which enables the sourcing, matching and/or management of properties for the Beneficiary, including on related schemes such as the Local Authority Housing Fund (LAHF) round 1 and 2 properties, where applicable.

7.6.4. Engagement with other organisations to help source appropriate settled accommodation.

7.6.5. Capital spend to bring forward settled accommodation (including but not limited to):

  • Refurbishing and/or converting local authority-owned residential or non-residential buildings, including defunct sheltered accommodation.

  • Acquiring, refurbishing and/or converting non-local authority owned residential or non-residential buildings, including bringing empty or dilapidated properties back into use.

  • Acquiring new build properties ‘off-the-shelf’, including acquiring and converting shared ownership properties.

  • Developing new properties, including through modern methods of construction (MMC).

  • Match funding LAHF rounds 1 and 2 properties for Afghan families.

  • Furnishings.

7.7. The funding is split into two specific categories:

7.7.1. Arrivals from 1 April 2023 to 31 August 2023, £7,100 per beneficiary residing in a bridging hotel (all bridging hotels closed on 31 August 2023) or temporary accommodation.

7.7.2. Arrivals from 1 September 2023 to 31 March 2024, £7,100 per beneficiary residing in transitional or temporary accommodation (and where applicable Ministry of Defence reception sites), capped at £35,000 per household.

7.8. Funding can be claimed once the Beneficiaries are confirmed as moving from bridging, temporary or transitional accommodation (and where applicable Ministry of Defence reception sites) into settled accommodation.

7.9. Funding, once claimed, will be paid in one lump sum.

7.10. Funding can only be claimed once per Beneficiary, irrespective of whether, for example, a Beneficiary moves between different local authorities. If multiple local authorities incur expenditure this should be resolved locally.

7.11. The key principles of the Funding are that it is:

7.11.1. Not ring fenced.

7.11.2. Supports programme evaluation and reporting.

7.11.3. The Authority will only approve one claim per Beneficiary; and

7.11.4. No further funding will be paid by the Authority to the Recipient under Schedule1, Part 7 of this funding instruction.

Funding and Claims Process

7.12. The Recipient may claim funding from the point at which the Beneficiary moves into settled accommodation.

Flexible Housing Funding available in 2023/24
Beneficiary – resident in bridging accommodation at 1/4/2023 £7,100 per Beneficiary
Beneficiary – resident in transitional accommodation (and where applicable Ministry of Defence reception sites) who arrived in the UK between 1 September 2023 and 31 March 2024. £7,100 per Beneficiary, capped at £35,000 per household.

7.13. The Recipient must make a claim on the specific “FLEXIBLE HOUSING FUND” Annex A to receive this single payment.

7.14. Guidance on how the Annex A should be included is included on the “Guidance Tab”.

7.15. Claims must be supported with evidence that the Beneficiary has been placed into settled accommodation, this may be in the form of a signed copy of the tenancy agreement or similar documentation.

7.16. Both the completed Annex A and the supporting information must be submitted using MOVEIT.

7.17. In submitting a claim under this Funding Instruction, the Recipient is confirming they have to the best of its knowledge and belief, submitted true and accurate information.

Monitoring and Evaluation

7.18. The Authority will require the Recipient to provide information regarding the use of this funding for monitoring and evaluation purposes to determine how it has been used to support Beneficiaries into settled housing.

7.19. The Authority will require the Recipient to provide information and documentation regarding Beneficiaries for monitoring and evaluation purposes.

7.20. This will include the provision of individual level information on Beneficiaries for the evaluation of the Schemes. The evidence form should only be submitted via the Authority’s secure data transfer portal, “MOVEIT DMZ”, to ensure compliance with UK Data Protection Legislation.

7.21. The Recipient shall provide information requested to monitor progress against the Statement of Outcomes. Visits may be made from time to time by the Authority or its appointed representatives, including the National Audit Office. Whilst there is no requirement for submission of detailed costings, the Recipient must be able to provide the costs for individual cases and will, if required, be expected to justify, explain, and evidence costs.

7.22. In all cases, to assist with monitoring and evaluation of the Schemes, the Recipient shall supply the Authority with all such financial information as is reasonably requested from time-to-time, on an open book basis.

7.23. Proof of spend is not required for funding to be released, only confirmation that the Beneficiary is confirmed as moving into settled accommodation to allow local authorities to access the funding as soon as possible.

ANNEX A – EXPENDITURE CLAIM PRO-FORMA

The following Annex A Excel spreadsheets, Additional Housing Support Costs claim form and Exceptional Costs claim form will be provided separately by the Afghan Schemes Payments Team.

  • ACRS/ARAP Annex A – Year 1 initial claim

  • ACRS/ARAP Annex A – Year 1 subsequent claims

  • ACRS/ARAP Annex A – Year 2 claims

  • Flexible Housing Funding – Annex A 2023/24 – Bridging Hotel residents

  • Flexible Housing Funding – Annex A 2023/24 – Transitional Accommodation residents from 1/9/2023 to 31/03/2024

  • ACRS/ARAP Exceptional Costs claim form – 2023/24

ANNEX B – UNHCR RESETTLEMENT SUBMISSION CATEGORIES

The Authority is responsible for identifying suitable Refugees for resettlement to the UK under the UK Resettlement Scheme in liaison with the United Nations High Commission for Refugees (UNHCR) based upon the following seven resettlement submission categories[footnote 13]:

  • Legal and or Physical Protection Needs

  • Survivors of Torture and/or Violence

  • Medical Needs

  • Women and Girls at Risk

  • Family Reunification

  • Children and Adolescents at Risk*

  • Lack of Foreseeable Alternative Durable Solutions

*UNHCR’s Categories of Children and Adolescents at Risk

  • Unaccompanied children (UAC): are those children who have been separated from both parents and other relatives and are not being cared for by an adult who, by law or custom, is responsible for doing so.

  • Separated children (SC): are those separated from both parents, or from their previous legal or customary primary care-giver, but not necessarily from other relatives. These may, therefore, include children accompanied by other adult family members.

  • Children without legal documentation: This would include children without legal documentation to prove their legal identity, and who may be particularly vulnerable and considered for resettlement, including:

1. children aged 0-4 years who lack evidence of their birth (no birth certificate, no birth notification passport or family booklet), and where one parent is not present (in particular, where the parent who has the right to pass nationality is not present), or

2. children aged 12-17 who lack documentation to prove their age and who face other protection risks (child labour, child marriage, child recruitment, children detained or in conflict with the law) who are at particular risk because they lack proof of their status as children and are therefore unable to prove their right to age-specific child protections under the law.

  • Children with specific medical needs: Child with serious medical condition is a person below the age of 18 that requires assistance, in terms of treatment or provision of nutritional and non-food items, in the country of asylum.

  • Children with disabilities: A child with disability is a person below the age of 18 who has physical, mental, intellectual, or sensory impairments from birth, or resulting from illness, infection, injury, or trauma. These may hinder full and effective participation in society on an equal basis with others.

  • Child carers: The Child Carer category includes a person below the age of 18, who is not an unaccompanied child and who has assumed responsibility as head of household. This could include, for example, a child who still lives with his/her parents, but has taken on the role of caring for them (and possible siblings) due to the fact that the parents are ill, disabled, etc.

  • Children at risk of harmful traditional practices, including child marriage and female genital mutilation: Person below the age of 18 years of age who is at risk of, or is a victim/ survivor of a harmful traditional practice. Every social grouping has specific traditional practices and beliefs, some of which are beneficial to all members while others are harmful to a specific group, such as women. Such harmful traditional practices include for instance, female genital mutilation, early marriage, dowry price, widow inheritance, female force feeding, witch hunting, female infanticide, son preference and its implications for the girl child. Depending on the circumstances, certain forms of male circumcision, scarring or tattooing fall also under this category.

  • Child labour: Includes children engaged in:

(i) the worst forms of child labour: Person below the age of 18 who is engaged in the worst forms of child labour, which include all forms of slavery or practices similar slavery (such as the sale and trafficking of children, debt bondage and serfdom and forced or compulsory labour, including forced or compulsory recruitment of children for use in armed conflict); the use, procuring or offering of a child for prostitution, for the production of pornography or for pornographic performances; the use, procuring or offering of a child for illicit activities, in particular for the production and trafficking of drugs as defined in the relevant international treaties; work which, by its nature or the circumstances in which it is carried out, is likely to harm the health, safety or morals of children; and

(ii) other forms of child labour: Person below the age of 18 who is engaged in forms of child labour other than the worst forms, such as work that is likely to be hazardous or to interfere with his/her education, or to be harmful to his/her health or physical, mental, spiritual, moral, or social development. UNICEF defines child labour as work that exceeds a minimum number of hours, depending on the age of a child and on the type of work. Such work is considered harmful to the child: ages 5-11: at least one hour of economic labour or 28 hours of domestic labour per week; ages 12-14: at least 14 hours of economic labour or 28 hours of domestic labour per week; ages 15-17: at least 43 hours of economic or domestic work per week.

  • Children associated with armed forces or armed groups are persons below the age of 18 who are or have been recruited into, or used by, an armed force or armed group in any capacity, including as fighter, cook, porter, messenger, spy, or for sexual purposes or forced marriage. It does not only refer to a child who is taking or has taken a direct part in hostilities.

  • Children in detention and/or in conflict with the law: Person below the age of 18 who is, or has been, charged or convicted for an infringement of the law.

  • Children at risk of refoulement[footnote 14]: Person below the age of 18 who is at risk of being returned to the frontiers of territories where his/her life or freedom would be threatened, or where he/she is at risk of persecution for one of more grounds of the 1951 Refugee Convention, including interception, rejection at the frontier or indirect refoulement.

  • Children at risk of not attending school: Person below the age of 18 who is unable or unwilling to attend school or is at heightened risk of interruption or discontinuation of his/her education.

  • Children survivors of (or at risk of) violence, abuse, or exploitation, including Sexual and Gender-Based Violence (SGBV): Person below 18 years of age, who is at risk of physical and/or psychological violence, abuse, neglect, or exploitation. The perpetrator may be any person, group, or institution, including both state and non-state actors.

ANNEX C – DATA SHARING PROTOCOL (DSP)

1. AIMS AND OBJECTIVES OF THE DSP

1.1 The aim of this DSP is to provide a set of principles for information sharing.

1.2 This DSP sets out the rules that the Recipient must follow when handling information classified as “personal data” by UK Data Protection Legislation in force.

2. DATA PROTECTION LEGISLATION

2.1 The UK Data Protection Legislation stipulates specific obligations upon all individuals who process personal data which must be adhered to. The UK Data Protection Legislation requires that all transfers of information fall within its six data protection principles. The Recipient, when processing personal data in connection with the Instruction, must comply with these principles of good practice.

2.2 Personal data must be processed in accordance with the following six data protection principles:

i. Lawfulness: processed lawfully, fairly and in a transparent manner in relation to individuals.

ii. Fairness and Transparency: collected for specified, explicit and legitimate purposes and not further processed in a manner that is incompatible with those purposes; further processing for archiving purposes in the public interest, scientific or historical research purposes or statistical purposes shall not be considered to be incompatible with the initial purposes.

iii. Purpose limitation: adequate, relevant, and limited to what is necessary in relation to the purposes for which they are processed.

iv. Accuracy: accurate and, where necessary, kept up to date; every reasonable step must be taken to ensure that personal data that are inaccurate, having regard to the purposes for which they are processed, are erased, or rectified without delay.

v. Storage limitation: kept in a form which permits identification of data subjects for no longer than is necessary for the purposes for which the personal data are processed; personal data may be stored for longer periods insofar as the personal data will be processed solely for archiving purposes in the public interest, scientific or historical research purposes or statistical purposes subject to implementation of the appropriate technical and organisational measures required by the UK GDPR in order to safeguard the rights and freedoms of individuals; and,

vi. Integrity and confidentiality (Security): processed in a manner that ensures appropriate security of the personal data, including protection against unauthorised or unlawful processing and against accidental loss, destruction, or damage, using appropriate technical or organisational measures.

3. SECURITY

3.1 The Recipient and its Staff shall exercise care in the use of information that they acquire during their official role, and to protect information which is held by them in accordance with the UK Data Protection Legislation. Such measures include:

  • not discussing information about a Beneficiary in public; and

  • not disclosing information to parties who are not authorised to have access to the shared information.

3.2 In addition to the above, the Recipient must ensure that:

  • personal data received is processed solely for the purposes of discharging their obligations for supporting the Beneficiary under this Instruction,

  • all personal data received is stored securely,

  • only people who have a genuine need to see the data will have access to it,

  • information is only retained while there is a need to keep it, and destroyed in line with government guidelines,

  • all reasonable efforts have been taken to warrant that the Recipient does not commit a personal data breach,

  • any information losses, wrongful disclosures or personal data breaches originating from the Authority are reported to the Authority’s Security team at [email protected],

  • they follow any information as provided by the Authority’s Security Team and Data Protection Officer, who will provide direction on the appropriate steps to take e.g., notification of the Information Commissioner’s Office (ICO) or dissemination of any information to the Beneficiary.

  • The responsibility to notify the Authority is not withstanding the internal policies SMPs, and local authorities will have regarding reporting data breaches to the ICO in their role as data controller in accordance with Clause 5 of this funding instruction.

3.3 Security breaches and incidents can result in government information being made available to those not authorised to have it or violate confidentiality. In the worst cases, a security incident or breach can jeopardise national security or endanger the safety of the public.

3.4 The Authority will make available further information as to what constitutes a personal data breach upon request.

3.5 As public sector bodies the Authority and the Recipient are required to process personal data in line with His Majesty’s Government Security Policy Framework (Security policy framework: protecting government assets - GOV.UK (www.gov.uk)) guidance issued by the Cabinet Office when handling, transferring, storing, accessing, or destroying information assets.

4. SUBJECT ACCESS REQUESTS

4.1 The Authority and the Recipient will answer any subject access or other requests made under the UK Data Protection Legislation that it receives for the data where it is the Controller for that data. In cases where such a request is received, both the Authority and the Recipient shall:

  • consult the other before deciding whether or not to disclose the information;

  • allow the other a period of at least five (5) working days to respond to that consultation;

  • not disclose any personal data that would breach the principles of the UK Data Protection Legislation; and,

  • give proper consideration to any arguments from the other as to why data should not be disclosed, and where possible reach agreement before any disclosure is made.

5. DATA TO BE SHARED

5.1 The Authority will share a variety of documents with the Recipient providing information on the Beneficiary/s. The type of data will be dependent on how and under which route the Beneficiary arrived in the UK, and may include:

5.1.1 Family Questionnaire (where available)

5.1.2. Temporary bridging hotel individual survey

5.2 The Authority will share with the Recipient the following documents for an ACRS Pathway 2 Refugee:

5.2.1 UNHCR Resettlement Registration Form (RRF)

5.2.2 IOM Migration Health Assessment form (MHA)

5.2.3 UNHCR Best Interest Assessments and Determinations

5.2.4 IOM Pre departure Medical Screening Form (PDMS) and Pre-embarkation Certificate (PEC).

5.3 The above documents will contain the following personal information on a Refugee:

UNHCR Resettlement Registration Form (RRF)

  • Biographic data for each Refugee including marital status, religion. Ethnic origin, contact details in host country;

  • Education, skills, and employment summary;

  • Known relatives of the principal applicant and spouse not included in the referral submission;

  • Summary of the Basis of the Principal Applicant’s Refugee Recognition[footnote 15];

  • Need for resettlement[footnote 16];

  • Specific needs assessment[footnote 17];

  • The number of people within a family due to be resettled, age and gender or family members;

  • The language spoken;

  • Ability to communicate in English; and

  • Any known specific cultural or social issues[footnote 18].

MHA Form

  • Consent from Refugee to conduct a medical examination;

  • Consent from the Refugee to Medical Advisors to disclose any existing; medical conditions to the Authority necessary for the resettlement process[footnote 19].

Best Interest Assessments and Determinations

  • Information about any particular safeguarding circumstances and an assessment of the best interests of the individuals affected[footnote 20].

PDMS Form and PEC

  • Biographic data for each refugee that requires this form;

  • Medical information in relation to the Refugee including medical history, updates on treatments and medication, on-going care requirements.

6. STORAGE, RETENTION AND DESTRUCTION SCHEDULE

6.1 The Recipient will keep all personal information shared securely in accordance with the handling instructions associated with the information security classifications as well as its own data retention and destruction schedules.

6.2 Recipients will not retain the personal information for longer than is necessary for the purpose of resettlement activity as outlined in the funding instruction.

6.3 A regular review shall be conducted by the Recipient to assess the necessity of retaining the Beneficiary’s personal data. Once the data is no longer relevant for those purposes it will be destroyed securely.

7. CENTRAL POINTS OF CONTACT FOR ISSUES, DISPUTES AND RESOLUTION

7.1 The Recipient shall provide the Authority with reasonable co-operation and assistance in relation to any complaint or request made in respect of any data shared under this data sharing arrangement, including providing the Authority with any other relevant information reasonably requested by the Authority.

7.2 Any operational issues or disputes that arise as a result of this DSP must be directed in the first instance to the Local Authority Engagement Team Strategic Regional leads.

8. STAFF RESPONSIBILITIES

8.1 Staff authorised to access a Beneficiary’s personal data are personally responsible for the safekeeping of any information they obtain, handle, use and disclose.

8.2 Staff should know how to obtain, use and share information they legitimately need to do their job.

8.3 Staff have an obligation to request proof of identity or takes steps to validate the authorisation of another before disclosing any information requested under this DSP.

8.4 Staff should uphold the general principles of confidentiality, follow the guidelines set out in this DSP and seek advice when necessary.

8.5 Staff should be aware that any violation of privacy or breach of confidentiality is unlawful and a disciplinary matter that could lead to their dismissal. Criminal proceedings might also be brought against that individual.

9. FREEDOM OF INFORMATION REQUESTS

9.1 Both the Authority and the Recipient will answer any requests made under the Freedom of Information Act 2000 that it receives for information that it holds solely as a result of, or about, this data sharing arrangement. In such cases where such a request is received, both the Authority and the Recipient shall:

  • Consult the other before deciding whether or not to disclose the information.

  • Allow the other a period of at least five (5) working days to respond to that consultation; and

  • Not disclose any personal data that would breach the principles of the UK Data Protection legislation.

10. METHOD OF TRANSFER OF A BENEFICIARY’S PERSONAL DATA

10.1 The Authority will use a secure process, known as MOVEit, to transfer the data which allows internal and external users to share files securely and shall provide the interaction between the parties.

10.2 The Recipient shall be given access to MOVEit over a web-based browser. Once this arrangement is operative, the Recipient shall, to the extent from time to time specified by the Authority, be required to use MOVEit for the purpose of its interface with the Authority under this Memorandum.

10.3 A list of authorised Staff should be available for inspection if requested by the Authority.

11. RESTRICTIONS ON USE OF THE SHARED INFORMATION

11.1 All information on a Beneficiary that has been shared by the Authority must only be used for the purposes defined in Section 3 of this DSP, unless obliged under statute or regulation or under the instructions of a court. Therefore, any further uses made of the personal data will not be lawful or covered by this DSP.

11.2 Restrictions may also apply to any further use of personal information, such as commercial sensitivity or prejudice to others caused by the information’s release, and this should be considered when considering secondary use of personal information. In the event of any doubt arising, the matter shall be referred to the Authority whose decision – in all instances – shall be final.

11.3 A full record of any secondary disclosure(s) must be made if required by law or a court order on the Beneficiary’s case file and must include the following information as a minimum:

  • Date of disclosure;

  • Details of requesting organisation;

  • Reason for request;

  • What type(s) of data has been requested;

  • Details of authorising person;

  • Means of transfer (must be by secure); and

  • Justification of disclosure.

11.4 The restrictions on secondary disclosures as set out in paragraph 11.1 and 11.2 of this DSP apply equally to third party recipients based in the UK and third-party recipients based outside the UK such as international enforcement agencies.

12. AUDITS

12.1 The Recipient agrees that it may be audited at the request of the Authority to ensure that the personal data has been stored and/or deleted appropriately, and that they have conformed to the security protocols set out in this DSP.

12.2 The Authority confirms that no other information would be reviewed or audited for this purpose.

ANNEX D - PROPERTY ADAPTATIONS FOR BENEFICIARY(S)

1. ‘In principle’ approval would need to be sought from the Afghan Schemes’ Payments Team in advance of any work being undertaken. Costs would be expected to be in line with average costs for each adaptation shown in the table below. The Schemes will also consider reasonable property adaptation reversal costs with approval sought from the Afghan Schemes Payments Team prior to any work.

2. Property adaptations for any Beneficiary who has mobility issues are divided into two categories:

a) minor adaptations which are included within the tariff rate, and

b) major adaptations which may be paid for from the Exceptional Cases fund.

Minor adaptations

3. These are works that do not need any structural changes to the property including:

  • grab rails

  • stair rails

  • lever taps

  • level access thresholds

  • half steps to doors

  • flashing/vibrating doorbells/smoke alarms, and

  • over bath showers.

These would be paid for from the standard tariff for each Beneficiary.

Major adaptations

4. These are works that do need structural changes to the property and can include:

Adaptation Estimated average cost (£GBP)
Level access shower facilities £3,500
Stairlifts £1,500 (Straight) – £5,000 (Corners)
Ramps £500 to £1,000
Changing the height of kitchen work surfaces £2,000
Adapting the home for wheelchair use such as widening doorways £600 - £800 per door
Ground floor bathroom/bedroom facilities £2,000 to £3,000

These may be funded by the exceptional cases fund following an assessment by an occupational therapist or similarly qualified person. The maximum that can be spent on any property is £30,000 and should not include extensions.

If a grant is made available for adapting a Social or Private Rented property the landlord is required to make the property available for letting by the tenant for a period of five (5) years upon completion of the work, in line with the Disabled Facility Grant arrangements.

ANNEX E – VOID COSTS FOR *FOUR BEDROOM PROPERTIES

1. Local authorities are already able to use the Year One tariff (see Schedule 1, Part 1) to pay for a period of void costs. To reflect this, fifty-six (56) Days void costs (‘voids’) are already built into the tariff to enable Recipients to secure properties before Beneficiary families arrive.

2. The Authority understands the supply challenges associated with securing *four (4) or more bedroom properties. To support Recipients and Community Sponsors to secure these properties when they become available, the Authority has agreed to fund an additional twenty-eight (28) Days voids as an Exceptional Cost outside of the tariff. This will bring the total period of voids covered up to eighty-four (84) Days.

Criteria

3. Recipients are able to submit an Exceptional Costs claim to pay for up to an additional twenty-eight (28) Days voids for four (4) or more bedroom properties only.

4. All claims must be accompanied by evidence demonstrating excess voids were incurred over and above the tariff fifty-six (56) Days, up to a maximum of an additional twenty-eight (28) Days.

5. The Authority will also consider other voids in exceptional circumstances, such as non-arrival of a family after the property has been secured.

6. Recipients are asked to contact their regional contact officer to discuss if they believe exceptional circumstances apply.

ANNEX F – GUIDE TO CLAIMING EXCEPTIONAL COSTS

1. In most circumstances ‘In principle’ approval would need to be sought from the Resettlement LA Payments Team in advance of any work being undertaken. Where there is an urgency, please contact the Resettlement LA Payment Team lead.

Approval in principle

1. Local Authority identifies the potential need for exceptional costs

2. Local Authority gathers the relevant information about the exceptional costs (see next page for examples of information)

3. Local Authority sends email to the Home Office seeking approval in principle with information and estimated expenditure for the exceptional costs

4. Email reply sent to the local authority with decision regarding the exceptional costs, in principle, request (within 10 working days)

Delays may occur when the Home Office receives insufficient information to decide in principle.

Examples of supporting information

Property adaptations

  • Information about the need for the adaptations e.g. OT assessment, other medical information.
  • Estimate of cost of each adaptation – at least two estimates should be supplied, to demonstrate that the best value for money has been achieved.

Void costs

  • Remember the tariff includes funding to cover the first 56 days for property rental.
  • Reason for claiming additional void costs.
  • Evidence of expenditure e.g. rent invoices.
  • Evidence of the date that the property was acquired for resettlement.

SEND costs

  • Information about the specific client needs, supported by Education, Care and Health Assessment (ECHA), Special Educational Needs Co-ordinator (SENCO) report or similar. Include details of what is being requested.
  • Cost of dedicated teaching support.
  • Advertisement for the teaching support.
  • Details and estimated costs of any specialist equipment, providing estimates to show best value for money.

Social Care costs

  • OT and medical assessments.
  • Details and estimated costs of specialist care.
  • Details and estimated costs of any specialist equipment, providing estimates to show best value for money.

Property adaptations

  • Information about the need for the adaptations e.g. OT assessment, other medical information.
  • Estimate of cost of each adaptation – at least two estimates should be supplied, to demonstrate that the best value for money has been achieved.

Processing an exceptional cost claim

  • Once expenditure has occurred, Local Authority may submit claim for pre-approved exceptional costs.
  • Local Authority completes “Exceptional Costs” claim form.
  • Claim submitted with the all the evidence of expenditure, either by email to [email protected] (if no personal information); or via MOVEit SRP Annex A account.
  • Afghan Scheme Payments team checks all the information submitted by the Local Authority.
  • If claim is complete, it will be approved for payment within 10 working days.
  • Payment Advice sent to Local Authority

ANNEX G – RECORD OF CHANGES TO THESE FUNDING INSTRUCTIONS (TO PREVIOUS PUBLISHED VERSION)

Page/paragraph number Details of change
Clause 1.5, page 5 Definition added: Branding Manual
Clause 1.40, page 8 Definition added: Social Value
Clause 13, pages 21 Added: Intellectual Property Rights and Branding
Clause 14, page 21-22 Added: Social Value Requirements
Schedule 1, Part 1, 1.8, page 24 Added under Find Your Own Accommodation; The Recipient should engage with the bridging local authority (where applicable) to confirm what type of support will need to be provided to the Beneficiary. Local authorities should endeavour to follow the principles in the Find Your Own Accommodation Working Protocol circulated on 26 April 2023.
Schedule 1, Part 1, 1.48, page 29 Added: In submitting a claim under this Funding Instruction, the Recipient is confirming they have to the best of its knowledge and belief, submitted true and accurate information.
Schedule 1, Part 2, 2.11, page 31 Added: In submitting a claim under this Funding Instruction, the Recipient is confirming they have to the best of its knowledge and belief, submitted true and accurate information.
Schedule 1, Part 4, 4.13, page 35 Added: In submitting a claim under this Funding Instruction, the Recipient is confirming they have to the best of its knowledge and belief, submitted true and accurate information.
Schedule 1, Part 7, 7.1-18, page 39-41 Added: Part 7 Covering Support Into Settled Accommodation: Statement Of Outcomes For Flexible Housing Funding

Date of following changes: 31 March 2024

Page/paragraph number Details of change
Front cover Date of issue changed to 31 March 2024. Version changed to 2.0
Article 1 - Definitions, 1.10 – Commencement date Expanded to include: “or later as indicated under non-integration tariff funding”
1.24 Definition of “Flexible Housing Fund (FHF)” included
1.45 Definition of “Transitional Accommodation”
Article 2 – This Instruction Expanded to include: 2.2.6. on Community Sponsorship Scheme for adult ESOL (ACRS Beneficiaries only) – Schedule 1, Part 6 and 2.2.7. for Flexible housing funding (non-tariff) – Schedule 1, Part 7.
Article 6 - Funding Paragraphs 6.2 and 6.3 expanded to provide further details in relation the “Ineligible Expenditure and Duplicate Funding”
Article 6 – Funding Paragraph 6.25 added: “Termination or Changes to the Funding Instruction”
Schedule 1 – Part 7 – Flexible Housing Funding Re-drafted to reflect changes in this non-integration funding for beneficiaries between 1 April 2023 – 31 August 2023, and those arriving from 1 September 2023 – 31 March 2024.
Annex A Additional Annex A: New Flexible Housing Funding – Annex A 2023/24 – Transitional Accommodation residents from 1/9/2023 to 31/03/2024
  1. https://gcs.civilservice.gov.uk/guidance/marketing/branding-guidelines/ 

  2. Please also refer to the Excellence Gateway for further information on the ESOL national curriculum and Skills for Life Curriculum 

  3. See Annex B 

  4. https://www.gov.uk/government/publications/supplier-code-of-conduct 

  5. It is the Authority’s preference that pre-pay coin or card meter accounts should not be used as these are generally more costly. Recipients seeking exceptions should liaise through the Authority’s relevant Local Authority Engagement Team Strategic Regional lead. 

  6. Case of Interest procedure – further information can be obtained from Local Authority Engagement Team Strategic Regional lead. 

  7. Payment values are valid only for the duration of this Funding Instruction; future years are indicative and may, from time to time, be adjusted by the Authority. 

  8. Payment values are valid only for the duration of this Funding Instruction; future years are indicative and may, from time to time, be adjusted by the Authority 

  9. Payment values are valid only for the duration of this Instruction; future years are indicative and may, from time to time, be adjusted by the Authority. 

  10. Payment values are valid only for the duration of this Instruction; future years are indicative and may, from time to time, be adjusted by the Authority. 

  11. Payment values are valid only for the duration of this Instruction; future years are indicative and may, from time to time, be adjusted by the Authority. 

  12. Payment values are valid only for the duration of this Memorandum; future years are indicative and may, from time to time, be adjusted by the Authority. 

  13. As defined in the UNHCR’s Resettlement Handbook (http://www.unhcr.org/46f7c0ee2.pdf

  14. Refoulement means the expulsion of persons who have the right to be recognised as refugees. 

  15. Classed as special category data under UK Data Protection Legislation. 

  16. Classed as special category data under UK Data Protection Legislation. 

  17. Depending on the content, this could be classed a potentially special category data under UK Data Protection Legislation. 

  18. Depending on the content, this could be classed a potentially special category data under UK Data Protection Legislation. 

  19. Classed as special category data under UK Data Protection Legislation. 

  20. Depending on the content, this could be classed a potentially special category data under UK Data Protection Legislation.