Application for an environmental permit: part C6 vary a water discharge activity, groundwater activity, or point source emission to water from an installation

Complete if you are applying to vary (change) a water discharge or groundwater activity permit, or point source emission to water from an installation.

Applies to England

Documents

Part C6: vary a bespoke water discharge activity and groundwater (point source) environmental permit

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

Complete part C6 if you want to apply to vary (change) the conditions or any other part of your permit.

You will also need to complete part:

If you are applying to vary or add a point source emission to water or sewer from an installation, you will also need to complete part C3 vary a bespoke installation permit.

You will need to use an Adobe Acrobat Reader product to complete the forms.

Applications we receive from 21 June 2024 must be on this updated version of the part C6 form. We will return any that are not.

Updates to this page

Published 14 February 2013
Last updated 21 June 2024 + show all updates
  1. Updated the application form and removed the separate guidance document. The guidance is now included in the form. Applications received after 21 June 2024 must be on the updated version of the form.

  2. Additional guidance for discharging effluents from an installation and for discharges made to roadside drains or ditches. Additional guidance relating to event duration monitoring point(s), whether watercourses receiving a discharge are dry for part of the year, and effluents that are not likely to contain specific substances.

  3. Updated Table 1 in the application form and added additional text in Appendix 6 to clarify the questions. Updated guidance to add text on checking for other permissions.

  4. Removed form F2. You now need to complete form F1 to change a permit for a water discharge or point source groundwater discharge activity.

  5. First published.