Brighton Main Line: emerging capacity strategy for control period 6

A pre-route study report on the Brighton Main Line, its capacity challenges and options for improvements.

Documents

Brighton Main Line: emerging capacity strategy for control period 6 pre-route study report

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This report by Network Rail provides an overview of the Brighton Main Line, its capacity challenges and options for improvements. It is accompanied by a letter featuring the department’s response to the report.