Guidance

Using cementitious mixtures at road works (TAL 4/14)

How to use cementitious mixtures in road work reinstatements, including strength requirements.

Documents

Using cementitious mixtures at road works (TAL 4/14)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This traffic advisory leaflet (TAL) gives guidance on:

  • the use of cementitious mixtures in road work reinstatements
  • what is required before road work reinstatements can be trafficked or overlaid

Cementitious mixtures, including high early strength mixtures, can be used to replace cementitious and unbound materials. Their use can reduce site occupation times.

Updates to this page

Published 12 November 2014

Sign up for emails or print this page