DECC Electricity Generation Costs 2013

This report presents levelised costs for electricity generation technologies; it details methodology, data & assumptions.

Documents

DECC Electricity Generation Costs 2013

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This report presents levelised costs for electricity generation technologies. A ‘levelised cost’ is the average cost of the lifetime of the plant per MWh of electricity generated. They reflect the cost of building, operating and decommissioning a generic plant for each technology. The report details the methodology, data and assumptions used to generate the levelised cost estimates.

The report has been updated since the version published on 17/07/2013 to include the further technologies in Table 20.

Updates to this page

Published 17 July 2013
Last updated 26 July 2013 + show all updates
  1. Report updated since the version published on 17/07/2013 to include the further technologies in Table 20

  2. First published.

Sign up for emails or print this page