Research and analysis

Dredged Material Disposal Site Monitoring (2022-2023)

Dredged Material Disposal Site Monitoring Round the Coast of England: Results of Sampling (2022-2023)

Documents

C6794 Disposal site monitoring report 2023_v0.4

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This report presents the scientific findings of, and implications for subsequent monitoring based on the results from, dredged material disposal site monitoring conducted under a Cefas/Marine Management Organisation Service Level Agreement project round the coast of England during 2022/23.

The main aims of this report are:

  • to aid the dissemination of the monitoring results

  • to assess whether observed changes resulting from dredged material disposal are in line with those expected

  • to compare the results with those of previous years (where possible)

  • to facilitate our improved understanding of the impacts of dredged material disposal at both a site-specific and a national (i.e. non site-specific) level

Updates to this page

Published 28 July 2023

Sign up for emails or print this page