Summary of responses
We received 2 representations in response to this consultation, including one from Moray Offshore Wind Farm (East) Ltd who is the offshore windfarm generator. They expressed strong support for the proposed exemption which would expire on the 31 March 2024.
We also received a response from Transmission Capital Partners (TCP). The joint venture and preferred OFTO bidder expressed strong support for the proposed exemption. TCP highlighted that a longer exemption period of up to 31 March 2024 was preferable to a shorter exemption. TCP outlined the risk of a shorter extension being the de-energisation of the wind farm, potentially affecting security of supply and causing additional delays to the OFTO transfer. TCP also suggested de-energisation of the wind farm could damage platform assets.
In line with our statutory obligations, we consulted Scottish Ministers and Consumer Scotland and received a response from the Scottish Government. The Minister of Energy expressed no objection to the time-limited exemption and outlined how this would enable the fault to be repaired prior to the transfer of the transmission assets. The Minister of Energy welcomed the role of offshore wind in the drive for decarbonisation and achieving net zero targets.
We received 2 confidential responses that did not raise any material concerns.
General information
Why we are consulting
We are seeking views on a proposed time-limited exemption from the requirement to hold a transmission licence in respect of the offshore wind farm owned and operated by Moray Offshore Windfarm (East) Limited (MOWEL).
Consultation details
Issued: 25 May 2023
Respond by: 22 June 2023
Enquiries to: [email protected]
Territorial extent: Great Britain, including the devolved administrations.
How to respond
Email to: [email protected]
Confidentiality and data protection
Information you provide in response to this consultation, including personal information, may be disclosed in accordance with UK legislation (the Freedom of Information Act 2000, the Data Protection Act 2018 and the Environmental Information Regulations 2004).
If you want the information that you provide to be treated as confidential please tell us, but be aware that we cannot guarantee confidentiality in all circumstances. An automatic confidentiality disclaimer generated by your IT system will not be regarded by us as a confidentiality request.
We will process your personal data in accordance with all applicable data protection laws. See our privacy policy.
Quality assurance
This consultation has been carried out in accordance with the government’s consultation principles.
If you have any complaints about the way this consultation has been conducted, please email: [email protected].
The proposals: Notice of proposed transmission licence exemption
Exemption from the requirement for a licence to transmit electricity: proposal to make the Electricity (Individual Exemption from the Requirement for a Transmission Licence) (Moray East) (Scotland) Order 2023
Summary
This consultation seeks views on our proposal to make an exemption from the requirement to hold a transmission licence for the Moray East offshore wind farm owned and operated by Moray Offshore Windfarm (East) Limited (MOWEL).
Proposal
The Secretary of State (SoS), pursuant to sections 5(2) and 5(3) of the Electricity Act 1989 (the Act), hereby gives notice of a proposal to make an order under section 5(1) of the Act granting exemption from the requirement to hold a transmission licence under section 4(1)(b) of the Act to the following windfarm currently in the process of transferring transmission assets under the Offshore Transmission Owner’s (OFTO) regime:
Moray Offshore Windfarm (East) Limited (MOWEL), (company number 07101438,with registered office address:
Shepherd And Wedderburn Llp Octagon Point
5 Cheapside
London
England
EC2V 6AA
in respect of the Moray offshore windfarm (East), with an overall capacity of up to 950MW. MOWEL is located in the Moray Firth, in the Northeast of Scotland. Its transmission assets are comprised of three offshore substations, three export cables and an onshore substation situated at New Deer in Aberdeenshire.
Legislative background
Section 4 of the Act sets out the activities for which licences are required, which includes the transmission of electricity. It specifies that an offence is committed if these activities are carried out without a licence. A transmission licence is granted by the Authority (the Gas and Electricity Markets Authority) under section 6(1)(b) of the Act. “Transmission” and the relevant term “transmission system” is defined in section 4.
Section 5 of the Act grants the SoS powers to grant exemptions from the requirement to hold various types of licences, including a transmission licence. Section 5(1)(c) allows the SoS to specify conditions that apply to exemptions. The exemption can be revoked if it appears to the SoS inappropriate that the exemption should continue to have effect, as set out in section 5(8).
Sections 6F and 6G of the Act allow offshore generators to transmit electricity without an offshore transmission licence subject to certain conditions, including the condition that the transmission takes place during the ‘commissioning period’. The commissioning period is defined as the period before and during the 18 months beginning on the day the Electricity System Operator (ESO) gives a completion notice to Ofgem.
Unlicensed transmission by an offshore generator after the end of the commissioning period is an offence under section 4(1)(b) of the Act, unless an exemption from the requirement to be licensed is granted.
Policy background and reasons for proposed order
The transmission cables linking offshore wind farms are licenced through a competitive regime. The transmission assets are typically built by the offshore wind developer in parallel with construction of the windfarm array. Once complete, Ofgem runs a tender to select the OFTO who will own and operate the transmission assets for a specified period.
The OFTO will then pay the generator the transfer value (determined by Ofgem through an open methodology) and will take ownership and responsibility for the operation of the transmission asset in return for a fixed revenue stream for the specified period.
Whilst the transmission assets can be built and tested by the OFTO itself (under the OFTO build option), all projects so far tendered have been built and tested by generators (under the generator build option).
Through this process we have introduced an important element of competition to the sector, which has been estimated to have delivered £700 million of savings over the first £3.1 billion worth of assets tendered, with further savings expected over subsequent tender rounds for assets estimated at a value in excess of £5 billion. The OFTO regime in the Act contemplates that the transmission asset is transferred to an independent OFTO within 18 months of the completion of the project. [footnote 1] This 18-month commissioning period allows for the technical demonstration of the asset to potential bidders, gives time for Ofgem to run a tender process and select a preferred bidder for the OFTO, and provides time to finalise commercial negotiations ahead of transfer.
Beyond this 18-month commissioning period the generator is not legally able to continue transmitting electricity, as doing so would constitute the transmission of electricity without a licence, which is an offence under section 4(1)(b) of the Act.
In late February 2023, Moray East offshore windfarm experienced a technical, export cable fault. MOWEL notified the Department of Energy Security and Net Zero about the fault on 16 March 2023 and sent a formal request for a section 5 transmission licence exemption on 14 April 2023. MOWEL have requested a time-limited transmission licence exemption from the Secretary of State. The additional time was requested to repair the cable and remove the faulty section for testing, ahead of completing the transfer.
A Root Cause Analysis will be conducted by MOWEL to determine whether the cable fault is an isolated issue or part of a wider problem with the transmission infrastructure. Once completed, MOWEL and the OFTO will re-enter transfer negotiations.
MOWEL have requested an exemption from the requirement to hold a transmission licence to 31 March 2024, 14 months after the original commissioning window. MOWEL have provided an estimated timeline for the OFTO transfer.
Existing guidance on licence exemptions
The Departmental guidance Electricity Generation, Distribution and Supply Licence Exemptions: Frequently Asked Questions (FAQs) (June 2017) addresses generation, distribution and supply licence exemptions but does not specifically provide guidance on transmission licence exemptions. This document is nevertheless used as a reference point for the Department’s policy on transmission licence exemptions. Although there are differences involved in transmission, and specifically offshore transmission, we are keen that there is consistency in our approach as appropriate.
The guidance states that the SoS may grant exemptions to an individual person or to “persons of a class” under section 5(1)(a) of the Act. Exemptions are routinely granted to generators of less than 100MW capacity due to their low impact on the total electricity system and because the exemption “does not pose a threat to the safe and secure operation of the electricity system”. Similarly, the continued operation of the assets covered by the proposed exemption does not threaten the safe and secure operation of the total electricity system for the following reasons:
- The offshore transmission assets to be granted exemptions do not have the same complexities as onshore transmission – they are point-to-point transmission cables, and are functionally simple connections to one generator rather than part of a complex grid that requires more active management by the ESO.
- In that context, the ESO already operates the system safely and securely while these generators are generating during the commissioning period.
In 2019, the SoS for Business Energy and Industrial Strategy (BEIS) granted 4 of the 5 projects in tender round 5 an exemption from the requirement to hold a transmission licence due to delays in the tendering process outside of the developers’ control.
In 2020, the SoS for BEIS granted exemptions to 4 projects due to delays to the transfer process as a result of the COVID-19 pandemic and response measures. These exemptions were granted on the basis that in each instance the delays constituted exceptional circumstances.
In 2022, the SoS for BEIS granted a further exemption to East Anglia One Limited to account for a further delay to the transfer process. While the ultimate cause of the delay was due to technical issues relating to the onshore cables, the delay was compounded by the restrictions put in place in response to the exceptional circumstances of the COVID-19 pandemic and its ongoing effects.
In 2022, the SoS for BEIS granted an exemption to Triton Knoll offshore windfarm to account for delays experienced from a cable fault, sufficient time for the parties to conclude commercial negotiations and allowing some additional time in case of complexities around insurance matters arising from the cable fault.
The Secretary of State’s Principal Objective
In carrying out functions under Part 1 of the Act (including considering granting any exemption from the requirement to hold a transmission licence), the SoS is required under section 3A to consider the principal objective of protecting the interests of existing and future consumers in relation to electricity conveyed by distribution systems or transmission systems. Consideration of consumers’ interests includes interests in: reduction of emissions of targeted greenhouse gases and security of supply of electricity to consumers. The SoS shall carry out his functions under Part 1 in the manner which he considers is best calculated to further the principal objective, wherever appropriate by promoting effective competition, and must have regard to the interests in section 3A(2), including the need to contribute to the achievement of sustainable development.
If the SoS were not to provide an exemption, we would anticipate that MOWEL would cease operation on or immediately after 9 October 2023, as to continue transmission of electricity without a licence or an exemption would be unlawful. If this situation continued for an extended period (i.e. more than a few weeks), the OFTO would likely require 3 months of normal operation after the windfarm is re-energised to be satisfied that there were no residual technical issues associated with the shut-down and to finalise the transfer of the transmission asset. Lawful transmission of electricity after 9 October 2023 to demonstrate the asset in this way would require an exemption to be granted first. The deadline created by the 18-month commissioning period is to ensure a timely transfer to the OFTO so that the benefits of the regime can be realised as quickly as possible. It would therefore be unsatisfactory if OFTO transfer process were to be extended well beyond the timeline that MOWEL has presented to us if an extended cessation of transmission occurred. This would delay the benefits to the consumer that can be expected as a result of the OFTO regime.
In the absence of compelling reasons to the contrary, we consider it to be in the public interest for offshore wind generation to be transmitted to shore so that it can reduce the overall level of greenhouse gas emissions from the power sector and contribute to a diverse and secure supply of electricity. We are satisfied that there would be no material distortions to competition or unfair economic advantage to be gained if an exemption were granted.
Providing an exemption would directly support future reductions in greenhouse gases by demonstrating to investors and developers that offshore windfarms can continue to transmit low-carbon power to the grid for the limited time required for the transfer of transmission assets to be completed. Enabling offshore wind generation to be lawfully transmitted to shore will help us reduce emissions, supporting the Government’s British Energy Security Strategy and climate change commitments.
In determining the length of any proposed exemption, the SoS will consider the delays experienced and expected by MOWEL, the need to complete the transaction in a timely fashion, and the contribution that MOWEL will make to security of supply of electricity and the reduction in costs to consumers as a result of displacing more expensive forms of generation.
Description
As such, we propose granting a time-limited transmission licence exemption to 31 March 2024, in line with MOWEL’s request.
Therefore, in line with the government’s efforts to reduce greenhouse gas emissions, increase domestic production of electricity and reduce reliance on energy imports, the SoS is minded to use the powers granted under section 5 of the Act to grant MOWEL a time-limited exemption from the requirement to hold a transmission licence.
Terms of proposed exemption
The Department has considered whether the terms of the exemption should include conditions that prevent generators from gaining any unfair commercial advantage as a result of being granted an exemption. In creating the proposed exemption, the Department has taken into consideration:
- Strict time limits: The duration of the proposed exemption will be strictly time limited. An expiry date would be included in the exemption order and the exemption would automatically expire if the transfer to the OFTO is completed before that date. We think that a proposed exemption that would run for to 31 March 2024 is appropriate to account for the delays to the process. This proposed exemption is also intended to allow MOWEL and the OFTO time to fix and understand the technical fault.
- Commercial advantage: In considering the best approach to take to address this issue, we considered whether there would be any financial advantage that could be enjoyed by a generator in receipt of a time-limited exemption, for example, through Transmission Network Use of System (TNUoS) charges or through the avoidance of paying a licence fee. Our conclusion is that there is no material advantage.
- Interaction with other policies: We also considered whether there would be any unintended interactions with other policies that could adversely affect the achievement of our objectives in other areas, which might justify imposing conditions. Again, we were not able to identify any.
We therefore do not consider it necessary for the exemption to be subject to conditions. MOWEL will still be required to comply with its obligations under its generation licences meaning it will continue to adhere to the codes of conduct, industry agreements and behavioural conventions. We note that there are economic incentives on MOWEL to complete the transfer and expect MOWEL to work towards a transfer as soon as possible and to report to the Department for Energy Security and Net Zero on progress towards this.
Summary
We invite views from interested parties on a proposal for the SoS to use his powers under the Electricity Act 1989 to grant an exemption from the requirement to hold a transmission licence to MOWEL to expire on 31 March 2024, 14 months after the original commissioning window. MOWEL has presented a timeline that envisages a transfer before 31 March 2024.
-
For these purposes, ‘completion’ refers to the date that Electricity System Operator gives Ofgem a ‘completion notice’ in relation to the project. ↩