Guidance

Employer's requirements Part A: General conditions

General Conditions and Annexes.

Applies to England

Documents

Part A: General conditions

Details

This document sets out:

  • general conditions and requirements
  • design and construction protocols
  • information deliverables and communications
  • management of the construction process
  • exchange information requirements

Part A should be read in conjunction with:

Or:

These documents form the Employer’s Requirements for the DfE Construction Framework 2021 and the Offsite Schools Framework (MMC1). Part B and Part C include the school or further education output specification.

For use by:

  • contractors
  • technical professionals
  • suppliers
  • schools
  • academies
  • providers
  • local authorities
  • dioceses

For specific output specification queries please contact: [email protected].

For further information on DfE Construction Framework 2021 please contact:[email protected].

For further information on DfE Schools Offsite Framework (MMC1) please contact: [email protected].

Updates to this page

Published 27 May 2022
Last updated 25 November 2022 + show all updates
  1. Replaced 'Part A: General Conditions' with an updated version.

  2. First published.

Sign up for emails or print this page