Equality impact assessment for HS2 Phase 2a
An assessment of the potential construction and operational effects of HS2 Phase 2a and the measures being taken to mitigate.
Documents
Details
The impact assessment includes any measures which are to be applied in the future to reduce or offset the potential effects of construction and operation.
This document accompanies the High Speed Rail hybrid Bill for Phase 2a of HS2 between the West Midlands and Crewe.
Consultation
The Phase 2a equality impact assessment was consulted on in 2018.
A draft of the HS2 Phase 2a equality impact assessment was consulted on in autumn 2016.
Since the publication of the Equality impact assessment for HS2 Phase 2a, an EQIA update report has been published to take account of the relevant changes and amendments included within the Supplementary Environmental Statement 1 and Additional Provision 1 and the Supplementary Environmental Statement 2 and Additional Provision 2.
Updates to this page
Published 17 July 2017Last updated 8 February 2019 + show all updates
-
Updated to reflect deposit of AP2
-
First published.