Decision

Galloper wind farm – Variation 3

Details of Galloper wind farm limited's project to build and operate an offshore generating station.

Documents

Galloper wind farm notice of variation

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Galloper wind farm deemed licence

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

On 24 May 2013, the Secretary of State for Energy and Climate Change granted a development consent order (DCO) for Galloper wind farm. The pre-application, examination and DCO documents can be found on the Planning Inspectorate’s website.

The DCO authorises Galloper wind farm limited to construct and operate an offshore generating station up to a maximum capacity of 504MW, situated about 27 kilometres off the south-east coast of Suffolk, in the Outer Thames Estuary. The development will comprise of up to:

  • 140 wind turbine generators
  • 3 meteorological masts
  • 4 offshore platforms
  • 3 export cables

On 13 January 2014, MMO received a request from Galloper wind farm limited to vary the deemed marine licence contained within schedule 2 of the Galloper wind farm Order 2013. MMO’s decision was to vary the deemed marine licence, effective from 3 April 2014.

On 3 February 2015 the MMO received a request from Galloper Wind Farm Ltd to vary the Deemed Marine Licence (DML) contained within Schedule 2 the Galloper Wind Farm Order 2013 to increase maximum monopile diameter from 7 to 7.5 metres. MMO’s decision was to vary the DML, effective from 17 September 2015.

In June 2016, the MMO imposed variations to the Deemed Marine Licence (DML) contained within Schedule 2 the Galloper Wind Farm Order 2013, to update existing navigation conditions to reflect the MMO’s agreed standard conditions and to add a requirement to agree a fisheries liaison and coexistence plan.

Updates to this page

Published 1 July 2016

Sign up for emails or print this page