Research and analysis

Geological disposal facility (GDF): high level cost review

A review and assessment of the potential construction and operational costs for a geological disposal facility.

Documents

Appendix B: Concept tunnel boring machine (TBM) GDF design layouts

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

The Committee has undertaken a high-level review and assessment of the potential construction and operational costs for a GDF, based on 2021 costings of methods of underground construction, equipment and operations.

The estimated cost used a series of key assumptions to arrive at the order of magnitude assessment.

It allows a comparison with cost estimates recently published in the Nuclear Waste Services (NWS) annual report.

Updates to this page

Published 28 October 2022

Sign up for emails or print this page