High level output specification 2012: Railways Act 2005 statement

What the Secretary of State wants to be achieved by rail activities during railway control period 5, from April 2014 to March 2019.

This was published under the 2010 to 2015 Conservative and Liberal Democrat coalition government

Documents

The High Level Output Specification (HLOS) 2012: Railways Act 2005 statement

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Secretary of State for Transport's guidance to the Office of Rail Regulation

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

DfT illustrative option schemes in control period 5 HLOS

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Map featuring all HLOS schemes

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Map featuring HLOS schemes already committed

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Map featuring other new HLOS schemes

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Map featuring rail HLOS electrification by 2019

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

High Level Output Specification (HLOS) 2012: Railways Act 2005 statement

The High Level Output Specification (HLOS) sets out information for the Office of Rail Regulation (ORR) and for the rail industry about what the Secretary of State for Transport wants to be achieved by railway activities during railway control period 5 (April 2014 to March 2019). The HLOS is a statutory requirement introduced by the Railways Act 2005.

Secretary of State for Transport’s guidance to the Office of Rail Regulation

This is general guidance issued by the Secretary of State to the Office of Rail Regulation (ORR) under the terms of the Railways Act 1993. The ORR must take account of this guidance in carrying out its functions as economic and safety regulator for the railways.

Illustrative option schemes in CP5 HLOS

Alongside HLOS, government publishes an illustrative option. This sets out the list of projects that government considers might be required to deliver the high level outputs that it specifies. Government looks to the rail industry to improve and find better ways of delivering the HLOS outputs.

HLOS 2017

HLOS 2017 is also available, which sets out what the Secretary of State for Transport wants the railway to achieve during control period 6 (2019 to 2024).