Decision

Hornsea Two Offshore Wind Farm – Variation 1

Details of Hornsea Two Offshore Wind Farm – Variation 1.

Documents

Hornsea two notice of variation

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Hornsea two variation cover letter

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Hornsea two variation request

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Hornsea Two varied deemed marine licence Schedule 9

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Hornsea Two varied deemed marine licence Schedule 11

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

In September 2016, the Secretary of State granted a Development Consent Order (DCO) for the Hornsea Project Two offshore wind farm. The pre-application, examination and DCO documents can be found on the Planning Inspectorate website.

The DCO authorises DONG Energy to construct and operate up to 2 offshore generating stations with a maximum capacity of 1800MW. The project is located adjacent to Hornsea Project One offshore wind farm in the North Sea and is located approximately 90km off the East Yorkshire coast. The development could comprise of up to:

  • 300 wind turbines
  • 2 offshore accommodation platforms
  • 6 offshore HVAC collector substations
  • 2 offshore HVDC converter substations
  • 2 offshore HVAC reactive compensation stations
  • subsea inter-array electrical circuits
  • subsea cable connections to the shore

On 18 July 2017, the Marine Management Organisation (MMO) received a request from DONG Energy to vary the Deemed Marine Licences contained within Schedules 9 and 11 of the Hornsea Two Offshore Wind Farm Order 2016.

The MMOs decision was to vary the DML as detailed in the Notice of Variation, effective from 26 September 2017.

Updates to this page

Published 31 August 2018

Sign up for emails or print this page