HS1: first interim evaluation

A first interim evaluation analysis of the High Speed 1 railway from St Pancras to the Channel Tunnel.

Documents

First interim evaluation of the impacts of high speed 1 final report – volume 1: main report

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

First interim evaluation of the impacts of high speed 1 final report – volume 2: appendices

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

These documents outline evaluation of the High Speed 1 railway from St Pancras to the Channel. The evaluation was undertaken by Atkins, the Department for Transport’s technical advisors.

The publications include the:

  • First interim evaluation of the impacts of high speed 1 final report – volume 1: main report
  • First interim evaluation of the impacts of high speed 1 final report – volume 2: appendices

A peer review of this evaluation by Oxera has also been published.