Decision

HS2 Bromford Tunnel extension: Transport and Works Act order

Application to update the existing legislation in respect of the HS2 Bromford Tunnel extension.

Documents

HS2 Bromford Tunnel extension order application

Secretary of State’s screening decision on the proposed HS2 Bromford Tunnel extension

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

Transport and Works Act order application from HS2 Limited to confer powers on HS2 Limited to amend the description of work no 3/157 in schedule 1 to the High Speed Rail (London-West Midlands) Act 2017 (‘the Act’). This is to allow work to be constructed in a tunnel under the powers conferred by the act.

Application details

This application is made under the Transport and Works Act 1992:

  • order: Proposed High Speed Rail (London-West Midlands) Act 2017 (Amendment) (Bromford Tunnel) order
  • application status: live application
  • date of application: 20 January 2022
  • applicant: High Speed 2 (HS2) Limited

Updates to this page

Published 31 March 2021
Last updated 21 January 2022 + show all updates
  1. The application is now live.

  2. First published.

Sign up for emails or print this page