Research and analysis

HS2 economic case: update

The updated economic case for High Speed Two, with reports and spreadsheets detailing the modeling outputs.

Documents

Updated economic case for HS2

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

London West Midlands appraisal sheets

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Phase 2 (Leeds, Manchester and Heathrow) appraisal sheets

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

London West Midlands demand sheets

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Phase 2 (Leeds, Manchester and Heathrow) demand sheets

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This report presents an updated economic case for both the phase one (London to West Midlands) and phase 2 (Leeds, Manchester and Heathrow) sections of the High Speed Two (HS2) route.

The appraisal spreadsheets include:

  • estimates of the operating and capital costs of HS2
  • a template that combines the costs and benefits to produce a benefit cost ratio (BCR) for each stage of the scheme

The PLANET Long-Distance (PLD) demand summary output spreadsheets provide key demand metrics for:

  • the 2010 base year
  • 2026 and 2037 forecast years

Updates to this page

Published 20 August 2012

Sign up for emails or print this page