HS2 Phase One information papers: environment (series E)
How High Speed Two (HS2) will meet environmental commitment controls both within and outside the Bill.
Documents
Details
These documents outline how ecological impacts have been assessed and how they will be mitigated or compensated for during the construction of Phase One of HS2 between London and the West Midlands including the:
- approach for managing excavated material and waste that will arise from construction
- approach to assess and mitigate the impact on water resources and flood risk
- effects of HS2 Phase One on roads and public rights of way (PRoW) along the line of route will be managed
- assessment and treatment of contaminated land
- approach to assess and reduce as far as reasonably practicable the impact on archaeological remains that could result from construction works
- scheme’s resilience and capacity to cope with potential climate change impacts
- carbon footprint and greenhouse gas assessment
If you experience any problems, contact the helpdesk:
HS2 helpdesk
High Speed Two (HS2) Ltd
Two Snowhill
Snow Hill Queensway
Birmingham
B4 6GA
The helpdesk team are unable to transfer calls internally to HS2 Ltd members of staff.
Updates to this page
Published 30 July 2014Last updated 29 June 2017 + show all updates
-
Minor update to paper E27 - land drainage
-
Information papers E20 (to v1.4), E21 (to v1.3) and E23 (to v1.4) have been updated and uploaded to this page
-