Map

HS2 Phase 2b (Crewe – Manchester) Additional Provision 2: Plans and Sections

Drawings providing details of the proposed works and land accompanying Additional Provision 2 (July 2023).

Documents

HS2 Phase 2b Additional Provision 2 Volume 1: Plans

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

HS2 Phase 2b Additional Provision 2 Volume 2: Sections

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

The AP2 plans show additional and amended works and land affected by Additional Provision 2. Replacement sections along the centreline of new and amended works show the level of those works in relation to existing land and features.

These documents are very large file sizes and, depending on your device and internet connection, may take a while to download.

Should you experience any problems, please contact the HS2 helpdesk:

HS2 helpdesk

High Speed Two (HS2) Ltd
Two Snowhill
Snow Hill Queensway
Birmingham
B4 6GA

Email [email protected]

Freephone 08081 434 434

Minicom 08081 456 472

The helpdesk team are unable to transfer calls internally to HS2 Ltd members of staff.

Updates to this page

Published 3 July 2023

Sign up for emails or print this page