Policy paper

HS2 Phase 2b information papers: Construction (D Series)

An outline of the construction methods, design, security and timetable for HS2 Phase 2b (Crewe – Manchester) route.

Documents

D1: Design

D2: Construction compounds

D4: Construction commissioner

D5: Working hours

D6: Inclusive design policy

D9: Worksite security

D12: Borrow pits

D13: Tunnels

D14: Tunnel shafts and portals

Details

The documents contained in Series D of our information papers describe:

  • the design development process prior to construction
  • interactions with local planning authorities and consultation with affected communities
  • controls on construction activities outlined in the Code of Construction Practice, including working hours
  • the construction timetable for Phase 2b (Crewe – Manchester); an overview of the main stages and a timeline
  • the use of borrow pits for construction
  • how access to property (due to temporary interference with the highway) will be maintained during construction works
  • mitigation for risks of disruption to public utilities during construction

If you experience any problems, please contact the HS2 helpdesk:

HS2 helpdesk High Speed Two (HS2) Ltd Two Snowhill Snow Hill Queensway Birmingham B4 6GA

Email [email protected]

Freephone 08081 434 434

Minicom 08081 456 472

Updates to this page

Published 24 January 2022
Last updated 3 July 2023 + show all updates
  1. Updated d1, d6, d11 and d13

  2. Updated D1 and D10.

  3. These papers are being updated as a result of changes made in AP1 and the removal of the Golborne Link.

  4. First published.

Sign up for emails or print this page