HS2 Phase 2b information papers: Environment (E Series)
How High Speed Two (HS2) will meet environmental commitments and the expected impacts on the environment for HS2 Phase 2b (Crewe – Manchester).
Documents
Details
Series E of our information papers outline how environmental impacts have been assessed and how they will be mitigated or compensated for during the construction of HS2 Phase 2b (Crewe – Manchester). This includes the:
- environmental controls set out in the Bill (and environmental minimum requirements)
- ecological impact of construction and operation and the mitigation in place to address this
- approach to controlling noise and air quality effects during construction and operation
- approach to managing excavated material and waste that will arise from construction
- approach to assessing and mitigating impacts on water resources and flood risk
- assessment and treatment of contaminated land
- approach to assessing any impact on archaeological remains that could result from construction works
- resilience and capacity of Phase 2b (Crewe – Manchester) to cope with potential climate change impacts
If you experience any problems, please contact the helpdesk:
HS2 helpdesk High Speed Two (HS2) Ltd Two Snowhill Snow Hill Queensway Birmingham B4 6GA
Email [email protected]
Freephone 08081 434 434
Minicom 08081 456 472
Updates to this page
Published 24 January 2022Last updated 25 July 2023 + show all updates
-
Updated E19.
-
Updated E16
-
Updated e2, e17, e18, e19, e22, e23, e26 and e27.
-
Updated E19.
-
Added E13 Control of construction noise and vibration v3.
-
These papers are being updated as a result of changes made in AP1 and the removal of the Golborne Link.
-
The following documents have been updated: E14: Air quality E24: Archaeology
-
First published.