Impact assessment

HS2 Phase 2b SES2 and AP2 ES Volume 1: Introduction and methodology and Glossary, abbreviations and references

Volume 1 is an introduction to the SES2 and AP2 ES. This volume provides an overview of changes included within SES2 and the amendments in AP2 ES. This page also contains a glossary of terms, list of abbreviations and references used in SES2 and AP2 ES.

Documents

HS2 Phase 2b SES2 and AP2 ES Volume 1: Introduction and methodology

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

HS2 Phase 2b SES2 and AP2 ES: Glossary, abbreviations and references

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

Volume 1 introduces the supplementary environmental information and changes to the design and construction assumptions included within SES2, and amendments which have resulted in the need to amend the Bill, which are reported within the AP2 ES. It also explains the environmental impact assessment process that has been applied.

The glossary of terms, list of abbreviations and references contain any terms and abbreviations used throughout the SES2 and AP2 ES.

These documents have been published as part of the HS2 Phase 2b SES2 and AP2 ES for the route between Crewe and Manchester.

Updates to this page

Published 3 July 2023

Sign up for emails or print this page