Guidance

HS2 Phase One environmental statement volume 5: draft code of construction practice

The draft 'Code of construction practice' sets out a series of measures to be applied during construction.

Documents

Draft code of construction practice

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This document has been published as part of the HS2 Phase One environmental statement for the route between London and the West Midlands. The environmental statement was produced to accompany the HS2 Phase One hybrid Bill.

The draft ‘Code of construction practice’, contains a series of measures and standards of work to be applied by HS2 Ltd and its contractors throughout the construction period of Phase One of HS2. This will provide a consistent approach to the management of construction activities across local authority boundaries. The draft ‘Code of construction practice’ will evolve and will be amended as necessary following further engagement during the parliamentary process.

Further documents are also available:

Updates to this page

Published 25 November 2013

Sign up for emails or print this page