Improving the grid connection process for electric vehicle charging infrastructure

Actions to improve the grid connection process for electric vehicle (EV) charging infrastructure.

Documents

Details

OZEV has been working with industry, to understand the barriers in obtaining a grid connection and the impact of electric vehicle (EV) charging infrastructure on the grid. 

From this work 7 ‘action areas’ have been identified as follows: 

  1. Energisation of chargepoint assets.
  2. Increased accessibility and streamlining of the connection offer process.
  3. Standing charges.
  4. Providing a forward look of investment to DNOs.
  5. Land access / wayleaves. 
  6. Consenting.
  7. Continued monitoring and evaluation. 

This review examines these areas and sets out a series of proposed actions. These are to be taken forward on a voluntary basis by charge point operators (CPOs), distribution network operators (DNOs) and government. 