Research and analysis

Birmingham M6 toll road study

Research into the traffic, freight, use and passenger decisions for the Birmingham M6 toll road.

Documents

Birmingham M6 toll road study: full research reports on freight, modelling, passenger choices and utilisation

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Birmingham M6 toll road study: summary reports on freight, passenger choices and utilisation

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

The study aimed to understand, through surveys and modelling, how toll levels influence travel when there is an option between a tolled and non-tolled route.

The study used a large number (35,000) of revealed and stated preference surveys and conducted an analysis of:

  • travel demand
  • willingness to pay
  • toll road utilisation

The M6 toll road north of Birmingham opened in 2004.

Updates to this page

Published 7 May 2013

Sign up for emails or print this page