Decision

GDA decisions: UK EPR nuclear reactor design by Electricite de France SA and AREVA NP SAS

Documents about the Environment Agency's decisions on UK EPR nuclear reactor design by Electricite de France SA and AREVA NP SAS.

Documents

Generic design assessment - UK EPR nuclear power plant design by Electricite de France SA and AREVA NP SAS. Supplement to decision document - Summary

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Generic design assessment - UK EPR nuclear power plant design by Electricite de France SA and AREVA NP SAS.Supplement to decision document

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

GDA statement of design acceptability for the UK EPR design submitted by Electricite de France SA and AREVA NP SAS (EDF and AREVA)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Asesu cynllun generig - cynllun gwaith ynni niwclear UK EPR gan Electricité de France SA ac AREVA NP SAS. Atodiad i'r ddogfen benderfynu - Crynodeb

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

These are the decision documents published in December 2012 following assessment by the Environment Agency.

Updates to this page

Published 13 December 2012

Sign up for emails or print this page