Research and analysis

Office for Nuclear Regulation (ONR): post-implementation review

Review of Part 3 of the Energy Act 2013, which established the Office for Nuclear Regulation (ONR), the UK’s independent nuclear regulator.

Documents

Office for Nuclear Regulation: post-implementation review 2022 - full report (web-optimised PDF)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Office for Nuclear Regulation: post-implementation review 2022 - full report (large print PDF)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

The post-implementation review (PIR) of Part 3 of the Energy Act 2013 (EA 2013) was commissioned in March 2021 by the Secretary of State for Business, Energy and Industrial Strategy (BEIS), as required by Section 118 of the EA 2013. The review concluded in March 2022, and the full report has been laid in Parliament.

In October 2024, the Department for Energy Security and Net Zero (previously BEIS) published a review of the progress made by the ONR against the recommendations in this PIR.

Updates to this page

Published 21 July 2022
Last updated 4 October 2024 + show all updates
  1. Added link to the report: ONR post-implementation review 2022: progress against recommendations.

  2. First published.