SEA of proposals to lease sites for windfarm development in the North West, Greater Wash, and Thames Estuary strategic areas.

This was published under the 1997 to 2007 Blair Labour government

Documents

Environmental Report and Phase 1 Proposals

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Annex 1: Round 2 SEA Assessment document

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Annex 2: Round 2 SEA Assessment document

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Annex 3: Round 2 SEA Assessment document

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Annex 4: Round 2 SEA Assessment document

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

In the report ‘Future Offshore’ (DTI, 2002), it was proposed that an announcement of a second competition for site leases (second leasing round), for offshore wind farms, would be made in Spring, 2003, focusing on three Strategic Areas.

These were identified and defined borders that, in certain localities, cross the boundary of UK territorial waters. To assist decision-making on the design and terms of the competition the Department of Trade and Industry (DTI) commissioned a Strategic Environmental Assessment (SEA) in line with the requirements of the ‘SEA’ Directive. The SEA has resulted in preparation of this Environmental Report on the proposals.