Ecomonic case for HS2: assumptions report

A summary of the input and forecasting assumptions used by the Planet Framework Model (PFM V4.3) to generate the 'HS2 standard case'.

Documents

The economic case for HS2: PFM v4.3 assumptions report

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

The appraisal of High Speed Two (HS2) requires a range of assumptions to compare costs and benefits in accordance with WebTAG guidance. This document outlines the assumptions that have been adopted and their sources.

The Planet Framework model v43 is a tool used by HS2 to help forecast the demands and benefits of the new high speed rail network.