Policy paper

Post Implementation Review of the Ecodesign for Energy Related Products Regulations 2010

This PIR assesses aspects of the effectiveness of the UK’s compliance and enforcement regime for energy-using products under the Ecodesign Directive

This was published under the 2015 to 2016 Cameron Conservative government

Documents

Post Implementation Review of the Ecodesign for Energy Related Products Regulations 2010 (S.I. 2010/2617)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Qualitative research on the Ecodesign for Energy-Related Products Regulations 2010: findings report

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This Post Implementation Review (PIR) assesses aspects of the effectiveness of the UK’s compliance and enforcement regime for energy-using products under the Ecodesign Directive

a. To what extent are the Regulations working? b. Is government intervention still required? c. Are the Regulations and the way they are implemented the most appropriate approach?

The PIR was underpinned by qualitative research undertaken for DECC and is also published here

Updates to this page

Published 11 February 2016

Sign up for emails or print this page