Correspondence

Rail electrification of TransPennine and Midland Mainline routes: resuming work

Letters exchanged in 2015 by the Secretary of State for Transport and Network Rail's Chairman about restarting 2 electrification schemes.

This was published under the 2015 to 2016 Cameron Conservative government

Documents

Letter from Sir Peter Hendy, the Chairman of Network Rail to Patrick McLoughlin, the Secretary of State for Transport, 29 September 2015

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Response from Patrick McLoughlin to Sir Peter Hendy, September 2015

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This correspondence concerns the rail electrification of TransPennine and Midland Mainline routes. It consists of:

  • a letter from Sir Peter Hendy, the Chairman of Network Rail addressed to Patrick McLoughlin, the Secretary of State for Transport
  • a response from Patrick McLoughlin addressed to Sir Peter Hendy

Updates to this page

Published 30 September 2015

Sign up for emails or print this page