Statutory guidance

SR2015 No 24: use of waste to manufacture timber or construction products

Standard rules for using waste to manufacture timber or construction products.

Applies to England

Documents

SR2015 No 24: use of waste to manufacture timber or construction products

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Generic risk assessment for SR2015 No 24

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

These standard rules allow you to store waste at a specified location and use it for manufacturing timber or construction products. Permitted wastes do not include hazardous wastes.

The total quantity of waste that can be stored and treated at the site under these standard rules is no more than 75,000 tonnes per year.

These standard rules do not permit the burning of any wastes, either in the open, inside buildings or in any form of incinerator.

You can apply online for most standard rules environmental permits.

Apply for a standard rules environmental permit.

Updates to this page

Published 1 December 2015
Last updated 3 April 2019 + show all updates
  1. We have updated the interpretation section 4.4 of the standard rule with a revised definition for the term ‘European Site’.

  2. Added to 'details' section: You can apply online for most standard rules environmental permits.

  3. First published.

Sign up for emails or print this page