SR2015 No 30: temporary diversion of a main river
SR2015 No 30: temporary diversion of a main river.
Applies to England
Documents
Details
These rules allow you to temporarily block a watercourse and divert the flow of water.
You must not block a watercourse:
- for more than 4 weeks
- that is wider than 8 metres
- within 8 metres of a flood defence
- during the fish breeding season for that river
- that is tidal
Updates to this page
Published 6 April 2016Last updated 31 July 2019 + show all updates
-
Updated operational conditions and screening distances associated with each standard rule. The aim of this is to improve the uptake of flood risk standard rules permits.
-
First published.