SR2021 No 6: anaerobic digestion facility, including use of the resultant biogas – installations
For a Part A installation with an anaerobic digestion treatment capacity of over 100 tonnes of waste, or waste and non-waste each day accepting no more than 100,000 tonnes each year.
Applies to England
Documents
Details
You can apply for this standard rules permit if:
- your activity meets the rules set out in the permit
- you can manage the potential risks as set out in the generic risk assessment
Updates to this page
Published 20 December 2021Last updated 5 July 2022 + show all updates
-
Edit to Appendix A - removal of contact details on form as no longer used.
-
Added 'or habitats' to the conservation screening distance in the Introductory note and under 2.2 The site.
-
First published.