Guidance

SR2022 No 3: construction, demolition and excavation waste transfer station

Standard rules for a waste transfer station accepting construction, demolition and excavation waste.

Applies to England

Documents

Details

This standard rules permit allows you to operate a construction, demolition and excavation waste transfer station.

You can apply for this standard rules permit if: 

  • your activity meets the rules set out in the permit 

  • you can manage the potential risks as set out in the generic risk assessment 

The charges for applying for this standard rules permit are: 

  • £2,641 for a new standard rules permit application 

  • £792 for a minor variation to the permit 

  • £2,529 to transfer the permit 

  • £1,585 to surrender the permit 

There is also an annual subsistence charge of £1,920 for the standard rules permit. 

You can get advice before you apply for a permit

How to apply for an environmental permit

This permit replaces:  

If you cannot comply with the new standard rules permit you will need to apply to vary your permit into a bespoke permit. You must apply within 3 months of the date the standard rules was published (18 December 2024).

Updates to this page

Published 18 December 2024

Sign up for emails or print this page