Research and analysis

Start up and shut down times of power carbon capture, usage and storage (CCUS) facilities

An investigation into start up and shut down times of gas-fired power carbon capture, usage and storage (power CCUS) facilities.

Documents

Start-up and shut-down times of power CCUS facilities: main report only

Start-up and shut-down times of power CCUS facilities: main report including annexes

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This technical report, based on a literature review and desk-based engineering study, investigates the start up and shut down times of a standard configuration gas-fired post combustion carbon capture, usage and storage plant facility (power CCUS). It also identifies potential improvements to the standard configuration.

AECOM carried out the report on behalf of BEIS.

Updates to this page

Published 17 August 2020