FOI release

Time scales for completion of work on AMP4 sites in Anglian water

Drinking Water Inspectorate (DWI) time scales of work on certain AMP4 sites in Anglian Water between 2005 and 2010.

Applies to England

Documents

Response to EIRs request for information about DWI time scales for completion of work on AMP4 sites in Anglian water 2005 to 2010.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Colney WTW 14 March 2007.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Lower Links WTW 22 April 2005.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Lower Links WTW 14 March 2007.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

DWI EIRs: Drinking Water Inspectorate (DWI) time scales for completion of work on the Lower Links Nitrate scheme and Colney Water Treatment Works (WTW) in Anglian water from 2005 to 2010 inclusive.

Updates to this page

Published 18 August 2014

Sign up for emails or print this page