Notice

TS10 5QW, Net Zero Teesside Power Limited: environmental permit issued - EPR/PP3501LR/A001

View the permit issued for Net Zero Teesside Power Station and Carbon Capture Plant, Redcar under the Industrial Emissions Directive.

Applies to England

Documents

Permit Issued: Net Zero Teesside Power Limited

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Decision Document: Net Zero Teesside Power Limited

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

The Environment Agency publish permits that they issue under the Industrial Emissions Directive (IED).

This decision includes the permit letter and decision document for:

  • Operator name: Net Zero Teesside Power Limited

  • Installation name: Net Zero Teesside Power Station and Carbon Capture Plant,

  • Permit number: EPR/PP3501LR/A001

Updates to this page

Published 15 May 2024

Sign up for emails or print this page