Research and analysis

UKCES Futures Programme evaluation: offsite construction

UKCES evaluation report for the offsite construction productivity challenge. This was the first challenge in the UK Futures Programme.

Documents

Evaluation of UK Futures Programme: Final Report on Productivity Challenge 1: Offsite Construction

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Evaluation of the UK Futures Programme: Offsite Hub (Scotland) Case Study Report

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Evaluation of the UK Futures Programme: Offsite Management School case study

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

A 10 year change programme: developing offsite construction skills for the challenges ahead

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

These briefing papers comprise the final evaluation report on the first productivity challenge of the UK Futures Programme (UKFP). This challenge was targeted at the offsite construction industry.

The first briefing paper is an evaluation of the five successful projects that UKCES invested in. These projects were led by BuildOffSite, Skanska, Edinburgh Napier University, Laing O’Rourke, and the Steel Construction Institute.

The second briefing paper is a detailed case study of the project led by Edinburgh Napier University, the Offsite Hub (Scotland).

The third briefing paper is a detailed case study of the Offsite Management School, the project led by a partnership of industry representatives.

The final document is a brochure summarising the five projects that made up the challenge. The brochure was launched at the 2015 Offsite Construction Show.

Updates to this page

Published 21 October 2015
Last updated 24 March 2016 + show all updates
  1. Added document "A Ten Year Change Programme".

  2. First published.

Sign up for emails or print this page