Impact assessment

Volume 2 MA05: Risley to Bamfurlong

Presents the likely significant effects of the construction and operation of High Speed Two, Phase 2b Crewe – Manchester on the environment within MA05.

Documents

Volume 2 MA05: Risley to Bamfurlong

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

Presents the likely significant effects of the construction and operation of High Speed Two, Phase 2b Crewe – Manchester on the environment within MA05.

Updates to this page

Published 24 January 2022

Sign up for emails or print this page