Impact assessment

Water Framework Directive preliminary compliance assessment (WR-001-OR003)

This report presents the interaction between High Speed Two, Phase 2b Crewe – Manchester with the objectives of the Water Framework Directive for the works at Annandale depot.

Documents

This report presents the interaction between High Speed Two, Phase 2b Crewe – Manchester with the objectives of the Water Framework Directive for the works at Annandale depot.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This report presents the interaction between High Speed Two, Phase 2b Crewe – Manchester with the objectives of the Water Framework Directive for the works at Annandale depot.

Updates to this page

Published 24 January 2022

Sign up for emails or print this page