Housing Statistics 2021-22 technical notes, accessible version
Updated 30 June 2022
Applies to England
Published 23 June 2022
1. National Statistics Status
The United Kingdom Statistics Authority designated these as National Statistics in February 2013, in accordance with the Statistics and Registration Service Act 2007 and signifying compliance with the Code of Practice for Statistics.
Designation can be broadly interpreted to mean that the statistics:
- meet identified user needs
- are well explained and readily accessible
- are produced according to sound methods
- are managed impartially and objectively in the public interest
Once statistics have been designated as National Statistics it is a statutory requirement that the Code of Practice shall continue to be observed.
The Office for Statistics Regulation (OSR) conducted a compliance check of these statistics in 2021-22 and confirmed their continued designation as National Statistics on 25 March 2022.
2. Data Sources and Quality
2.1 Data for the following programmes have been produced using our Investment Management System (IMS), which contains information provided by investment partners in accordance with monitoring requirements for the payment of grant: Affordable Homes Guarantees, AHP, AHP 2015-18, AHP 2021-26, Care and Support Specialised Housing, Empty Homes, Empty Homes Round Two, FirstBuy, Homelessness Change, Homelessness Change 2015-18, the Kickstart Housing Delivery Programme (HomeBuy Direct and National Affordable Housing Programme), the Local Authority New Build Programme, Mortgage Rescue, the National Affordable Housing Programme, Platform for Life, Rent to Buy, Right to Buy Replacement, Short Form Agreements, SOAHP 2016-21 and Traveller Pitch Funding.
2.2 Investment partners are responsible for self-certifying and validating any outputs funded through Homes England’s affordable housing programmes based on the relevant guidance (Capital Funding Guide) and in accordance with the terms and conditions of their grant funding agreement. An annual compliance audit is undertaken by externally appointed auditors of a sample of randomly selected self-certified outputs (around 10% of all schemes which completed in the previous year are selected for auditing).
2.3 Data for the following programmes have been produced using our Project Control System (PCS), which is maintained by our own staff based on the best information currently available: Accelerated Land Disposal, Build to Rent, Builders Finance Fund, Economic Assets, Get Britain Building, Kickstart Housing Delivery (Investment Support), Local Authority Accelerated Construction, Property and Regeneration, Single Land and the HBF – STF programmes.
2.4 Data in PCS are validated by Homes England staff (project managers) and evidenced through documentation obtained from independent third parties such as progress reports and completion certificates from warranty providers and building control inspectors. Further data integrity checks are carried out by programme support teams who ensure that data are accurately and consistently recorded e.g. starts and completions match each other in terms of quantity and tenure etc.
2.5 The levels of affordable housing starts on site and completions recorded in the first half of the year reflect the historical annual delivery profile of the programmes. Homes England data is dependent on the submission of grant claims by providers and historically the majority have been submitted in the second half of the year. The table below shows the percentage of affordable housing delivered in each half of the year since 2009-10.
Table 3: Affordable Housing - Half Yearly Percentage Delivery
Year | Period | Total affordable housing starts | Total affordable housing completions |
---|---|---|---|
2021-22 | April - September | 43% | 38% |
2021-22 | October - March | 57% | 62% |
2020-21 | April - September | 35% | 34% |
2020-21 | October - March | 65% | 66% |
2019-20 | April - September | 37% | 37% |
2019-20 | October - March | 63% | 63% |
2018-19 | April - September | 32% | 39% |
2018-19 | October - March | 68% | 61% |
2017-18 | April - September | 25% | 36% |
2017-18 | October - March | 75% | 64% |
2016-17 | April - September | 32% | 38% |
2016-17 | October - March | 68% | 62% |
2015-16 | April - September | 35% | 37% |
2015-16 | October - March | 65% | 63% |
2014-15 | April - September | 36% | 26% |
2014-15 | October - March | 64% | 74% |
2013-14 | April - September | 30% | 30% |
2013-14 | October - March | 70% | 70% |
2012-13 | April - September | 13% | 35% |
2012-13 | October - March | 87% | 65% |
2011-12 | April - September | 4% | 28% |
2011-12 | October - March | 96% | 72% |
2010-11 | April - September | 27% | 36% |
2010-11 | October - March | 73% | 64% |
2009-10 | April - September | 21% | 37% |
2009-10 | October - March | 79% | 63% |
Some of the significant variations are explained below:
In 2011-12 delivery was lower than usual with 4 per cent of starts on site and 28 per cent of completions delivered in the first half of the year. The low percentage of starts on site was atypical because the distribution was impacted by the closure of the National Affordable Housing Programme, the Local Authority New Build Programme and the Kickstart Housing Delivery Programme to new commitments in March 2011. Delivery was further impacted by the AHP 2011-15 programme not commencing delivery of housing starts until the second half of 2011-12.
In 2012-13, 13 per cent of starts on site and 35 per cent of completions were delivered in the first half of the year, reflecting an increase in delivery of the AHP 2011-15.
Assessment of Data Quality
3.1 In 2015 the United Kingdom Statistics Authority (UKSA) published a regulatory standard for the quality assurance of administrative data. To assess the quality of the data provided for this release Homes England has followed that standard.
3.2 The standard is supported with an Administrative Data Quality Assurance Toolkit (available on the linked website in the paragraph above) which provides useful guidance on the practices that can be adopted to assure the quality of the data they utilise.
3.3 The Housing Statistics release is produced using data from two of Homes England’s systems – IMS and PCS. An assessment of the level of risk based on the Quality Assurance Toolkit is as follows:
- risk/profile matrix statistical series: Homes England housing statistics
- administrative source: Homes England data systems
- data quality concern: low
- public interest: high
- matrix classification: medium risk A2
3.4 The Homes England Housing Statistics publication can be considered as high public interest as the agency has the remit of being the government’s housing accelerator and therefore there is significant media interest and high political sensitivity as well as economic importance.
3.5 The Data Quality Concern is considered to be low as all data come from systems within Homes England. Those systems have robust measures in place to ensure that data is checked and validated as described under ‘Data Sources and Quality’ above.
Figure 1 ‘Quality assurance flow diagram operational context and administrative data collection’ has been removed becuase it could not be made accessible. Please contact [email protected] citing the name of the document if you need this information.
The main data sources for Homes England Housing statistics are the Investment Management System (IMS) and Project Control System (PCS) utilised by the organisation to manage Homes England’s programmes.
4. Revisions
Revisions policy
4.1 Homes England has adopted the revisions policy developed by DLUHC[footnote 1] . This policy covers two types of revisions.
Scheduled revisions
4.2 These statistics are drawn from funding and project administration systems and therefore updated information can be provided by funding recipients and developers after the official statistics have been extracted and compiled from these systems. This is particularly the case during the financial year and figures for the first six months of the year, as reported in the November/December release, are subject to scheduled revision in the release of financial year data in May/June. It is also possible for revisions to be made for earlier periods, although procedures are in place to minimise the scale of these.
4.3 As notified in our release of official statistics published on 11 June 2013, we will make scheduled revisions once a year in May/June. These revisions will cover the first six months of the full year being reported together with revisions for the previous two financial years. Data for earlier years will be regarded as final and there will be no further changes.
Non-scheduled revisions
4.4 If a substantial error occurs as a result of the production process, the statistical release and accompanying tables will be updated with a correction notice as soon as is practical.
4.5 If, as a result of new information, there are significant or noteworthy changes to the figures in years outside of the scheduled revisions period, that information will be revised in the May/June release together with scheduled revisions.
Revisions in this release
Revisions for the six-month period 1 April to 30 September 2021, as published on 2 December 2021
4.6 The total housing starts figure for the AHP 2021-26 has increased by 1,391 units from 1,022 to 2,413. The increase relates to Strategic Partnership starts connected with delivery processing routes where the start is recorded at completion.
4.7 The total housing completions figure for LAAC has decreased by one unit from 141 to 140. The net decrease relates to three schemes in which updated information was received after publication of the December 2021 release.
4.8 The total housing starts figure for the SOAHP 2016-21 has increased by 1,140 units from 7,321 to 8,461. The increase relates to Strategic Partnership starts connected with delivery processing routes where the start is recorded at completion.
4.9 The total housing starts figure for the SLP has increased by 111 units from 2,385 to 2,496. The net increase relates to five schemes in which updated information was received after publication of the December 2021 release.
4.10 The total housing completions figure for the SLP has increased by 83 units from 1,979 to 2,062. The net increase relates to 24 schemes in which updated information was received after publication of the December 2021 release.
4.11 The total housing starts figure for the HBF – STF has increased by 244 units from 2,105 to 2,349. The net increase relates to four schemes in which updated information was received after publication of the December 2021 release.
4.12 The total housing completions figure for the HBF – STF has increased by 22 units from 2,604 to 2,626. The net increase relates to seven schemes in which updated information was received after publication of the December 2021 release.
Revisions for the financial year ending 31 March 2021 (2020-21), as published on 2 December 2021
4.13 The total housing starts figure for LAAC has increased by two units from 1,371 to 1,373. The increase relates to a single scheme in which a project review revealed a shortfall.
4.14 The total housing starts figure for the SLP has decreased by six units from 5,619 to 5,613. The net decrease relates to 10 schemes in which data was amended following project reviews.
4.15 The total housing completions figure for the SLP has increased by 55 units from 4,942 to 4,997. The net increase relates to 10 schemes in which data was amended following project reviews.
4.16 The total housing starts figure for the HBF – STF has decreased by five units from 3,980 to 3,975. The net decrease relates to four schemes in which data was amended following project reviews.
4.17 The total housing completions figure for the HBF – STF has decreased by three units from 6,076 to 6,073. The net decrease relates to data being amended on nine schemes following project reviews.
Revisions for the financial year ending 31 March 2020 (2019-20), as published on 2 December 2021
4.18 The total housing completions figure for BTR has increased by 94 units from 537 to 631. The increase relates to a single scheme in which the completions had previously been removed in error.
4.19 The total housing starts figure for the SLP has decreased by 80 units from 9,237 to 9,157. The net decrease relates to 14 schemes in which data was amended following project reviews and the receipt of updated information from developers.
4.20 The total housing completions figure for the SLP has increased by 78 units from 7,044 to 7,122. The net increase relates to eight schemes in which data was amended following project reviews and the receipt of updated information from developers.
4.21 The total housing starts figure for the HBF – STF has increased by five units from 4,472 to 4,477. The net increase relates to the receipt of updated information from developers on two schemes.
4.22 The total housing completions figure for the HBF – STF has decreased by 14 units from 5,703 to 5,689. The decrease relates to data being amended on two schemes following project reviews.
If you would like to comment on our revisions policy please contact Mike Shone by email at [email protected].
Definitions
Affordable housing
Affordable Housing is the sum of Affordable Rent, Social Rent, Intermediate Rent and Affordable Home Ownership (Shared Ownership and Rent to Buy). Affordable homes are defined in line with the National Planning Policy Framework[footnote 2] , published 27 March 2012 and updated 20 July 2021, as housing units (or traveller pitches and bed spaces when describing a shared dwelling such as a hostel) provided to specified eligible households whose needs are not met by the market. Eligibility may be determined with regard to local authority allocations policies, local incomes and local house prices depending on the type of affordable housing. Affordable housing should include provisions to remain at an affordable price for future eligible households or for the subsidy to be recycled for alternative affordable housing provision. The term ‘affordable housing’ is equivalent to ‘social housing’ as defined in Section 68 of the Housing and Regeneration Act 2008[footnote 3] .
Affordable rented housing
Affordable rented housing is a form of social housing, introduced in 2011. It may only be delivered with grant through the AHP 2011-15 and other associated and subsequent programmes or without grant by local authority and other providers, where a contract or confirmation of the ability to charge an Affordable Rent is in place. Affordable rented homes are let by local authorities or private registered providers of social housing to households who are eligible for social rented housing. Affordable Rent is subject to rent controls that require a rent of up to 80 per cent of the local market rent (including service charges, where applicable).
Social rented housing
Social rented housing is rented housing owned and managed by local authorities and private registered providers, for which target rents are determined through the national rent regime. It may also include rented housing managed by other persons and provided under equivalent rental arrangements to the above.
Intermediate affordable housing
Intermediate affordable housing is housing at prices and rents above those of Social Rent but below market price or rents, and which meet the criteria as set out in the definition for affordable housing. These can include Shared Ownership, equity loan products, Rent to Buy and Intermediate Rent. Intermediate rented housing was eligible for funding under the now closed NAHP.
Equity loan scheme
Under an equity loan scheme for affordable housing, the majority of the cost (usually at least 70 per cent) is funded by the purchaser through a mortgage and savings (deposit). The remaining cost of the home is paid for by the government and the house builder through an equity loan. The property title is held by the home owner who can therefore sell their home at any time and upon sale should provide the government and the house builder the value of the same equity share of the property when it is sold. In the historical series covered by this release, equity loan was available under FirstBuy, Kickstart and the NAHP (HomeBuy Direct). There are a small number of equity loan cases in the current series.
Shared Ownership scheme
Shared Ownership allows a household to buy a share of a home from an affordable housing provider, with the provider owning the remaining share. Rent is paid by the purchaser on the share owned by the provider. The purchaser has the option of buying additional shares up to 100% through a process known as ‘staircasing’. There are exceptions to this for some Shared Ownership homes in rural areas and homes developed for older persons.
From 1 April 2021 there are two Homes England funding programmes running concurrently and delivering Shared Ownership products. First, the legacy Shared Ownership Affordable Homes Programme (SOAHP) 2016 to 2021 (see SOAHP 2016-21 for a summary of this programme) where Shared Ownership completions will continue until the end of March 2023. Second, the Affordable Homes Programme (AHP) 2021 to 2026 which began on 1 April 2021 with completions to be achieved by the end of March 2026.
For Shared Ownership homes funded through the SOAHP 2016 to 2021 the households are able to purchase a share between 25 per cent and 75 per cent and can only staircase in minimum increments of 10 per cent. For Shared Ownership homes funded through the AHP 2021 to 2026 households can purchase between 10 per cent and 75 per cent and can staircase by as little as 1 per cent per year in the first 15 years.
The Government introduced other changes to the Shared Ownership product from 1 April 2021 through the AHP 2021 to 2026. For more information and detail on these changes please refer to the Government’s New model for Shared Ownership: technical consultation - summary of responses and Homes England’s Capital Funding Guide – Shared Ownership.
Rent to Buy scheme
Under the Rent to Buy scheme for affordable housing, homes are let at an Intermediate Rent to tenants who plan to buy in the future but need a period of lower rents to help them to save for a deposit. After an initial rental period (at least the first five years of the life of the property) the tenant has the option to buy outright the home they are living in. Grant funded Intermediate Rent has to be set at no more than 80 per cent of the market rate.
First Homes
First Homes are a specific kind of discounted market sale housing and should be considered to meet the definition of ‘affordable housing’ for planning purposes. See https://www.gov.uk/guidance/first-homes for further details.
Market housing
Market housing is private housing (or bed spaces) for rent or for sale where the rental value or market price is set mainly in the open market.
Acquisitions (non-new build)
Acquisitions (non-new build) are additions to affordable or market housing supply that take place without building a new property. This can include the purchase of existing properties for use as affordable or market housing. It may also include empty properties brought back into use. These will normally be long term empty properties where rehabilitation works are required and which would not otherwise come back into use without intervention. Conversions of existing affordable or market properties are only included where there is substantial re-improvement works carried out to the fabric of the building (for example the conversion of bedsits to self-contained apartments). Repairs or simple refurbishment of properties are not included.
Housing starts on site
Housing starts on site are reported when the provider/developer and builder have entered into the house building contract, the building contractor has taken possession of the site and the start on site works have commenced. Starts on site are not applicable for Mortgage Rescue or for equity loan products delivered under FirstBuy.
Housing completions
Housing completions are reported when the units are fit for occupation or, in the case of Mortgage Rescue and equity loan products delivered under FirstBuy, the Kickstart Housing Delivery Programme, the AHP 2011-15 and the National Affordable Housing Programme, at the point of completion of the purchase.
Private registered providers
Private registered providers, under the terms of the 2008 Housing and Regeneration Act[footnote 4] , are organisations which provide social housing, either in a for-profit or not-for-profit capacity, and who are registered on the Statutory Register of Providers of Social Housing maintained by Homes England. Most private registered providers are housing associations. The term excludes local authorities, who also provide social housing. Any private provider wishing to deliver Affordable Rent homes, who has not contracted with Homes England through a Grant Agreement, must contract with Homes England through a Short Form Agreement to deliver Affordable Rent without grant. The definition of private registered providers is not affected by the Office for National Statistics’ decision to classify them to the private sector for National Accounts and statistical purposes (16 November 2017)[footnote 5] .
6. Related statistics
Affordable housing starts on site and completions funded by Homes England and the GLA
6.1 Since April 2012, the Mayor of London has had oversight of strategic housing, regeneration and economic development in London. This means that Homes England no longer publishes affordable housing starts on site and completions for London, except for delivery in London under the Builders Finance Fund (now called the Home Building Fund – Short Term Fund) and Get Britain Building programmes which are administered by Homes England on behalf of the GLA. Responsibility for publication of other London delivery has been taken over by the GLA. In addition to its annual release, DLUHC combines half-year data from Homes England and the GLA to publish six monthly affordable housing starts on site and completions delivered nationally under the affordable housing programmes of Homes England and the GLA.
6.2 The combined statistics published by DLUHC are available from the DLUHC website[footnote 6] and housing statistics published by the GLA are available from the GLA website[footnote 7] . DLUHC has combined the affordable housing statistics in this release with the GLA’s affordable housing statistics to produce Table 1012 showing total affordable housing starts on site and completions delivered nationally under the affordable housing programmes of Homes England and the GLA[footnote 8] .
6.3 Delivery of affordable homes forms part of the DLUHC business plan. Homes England is responsible for the administration of the programmes that deliver affordable housing (as described in section 2 of the statistics release document[footnote 9] ) and report on progress in their annual report[footnote 10].
Help to Buy
6.5 The Help to Buy (Equity Loan scheme) release published by DLUHC details the number of home purchases and the value of equity loans under the Government’s Help to Buy: Equity Loan scheme. Homes England is responsible for all Help to Buy (Equity Loan scheme) delivery including London. The number of home purchases delivered through Homes England is published by DLUHC together with information about the type and price of properties purchased, purchaser deposits and applicant incomes[footnote 11] .
Statistics for other nations of the UK
Wales
The Welsh Government publishes an annual statistical release on additional affordable housing delivered across Wales. The data are based on direct returns from local authorities, National park authorities and registered social landlords. Affordable housing applies to housing where secure mechanisms are in place to ensure that it is accessible to those who cannot afford market housing, both on first and subsequent occupation as defined in Technical Advice Note (TAN) 2[footnote 12] Planning and Affordable Housing (2006). The figures cover all additional affordable housing units, whether through new build, purchase, acquisition, leasing or conversion of existing dwellings. They do not take account of any loss of affordable housing stock through demolitions or sales during the year.
Affordable housing includes social rented housing that is provided by local authorities and registered social landlords as well as intermediate housing where prices or rents are above those of social rent but below market housing prices or rents. Figures include additional affordable housing units provided under schemes which may provide for stair-casing to full ownership as long as there are secure arrangements in place to ensure the recycling of capital receipts to provide replacement affordable housing. The additional affordable housing figures shown within this release include those housing units leased to provide accommodation for homeless families where the lease is for more than a year. It should be noted however that these units do not fully conform to the TAN 2 definition in relation to the subsequent occupation once the lease has expired.
The additional affordable housing figures will include any units that have been specifically delivered through planning obligations (section 106 agreements) or planning conditions either as a part of or as a result of market housing developments. The number of affordable homes provided on a particular site will be determined by the local authority’s planning policy and negotiations with the developer. The agreed affordable housing contribution will be secured via a section 106 agreement which is a legally binding contract between a developer and a local planning authority that operates alongside a planning permission.
The latest annual release is available on gov.wales
The full data set is available on Stats Wales.
Information on related statistics for other UK countries is shown in the Quality report published alongside the annual release.
Scotland
The Scottish Government publishes statistics on affordable housing supply in Scotland as part of the Housing Statistics Quarterly Updates.
Excel tables on affordable housing supply in Scotland are available in a separate link to the publication.
Figures are also published as open data on statistics.gov.scot.
The affordable housing supply statistics are based on information held in the Scottish Government Affordable Housing Supply Programme administration system, which records activity on all affordable housing projects which receive some form of government support through loans, grant or guarantees, but which will exclude some units which are delivered without government support, such as some contributions by private sector developers which are agreed through the planning system. Information available includes the number of units which are approved, started and completed in each quarterly period. The approvals, starts and completions are also split by the type of affordable housing provided, and whether the units are classified as new build, off-the-shelf or rehabilitation. The affordable housing supply figures exclude demolitions and any sales of existing stock, and so should be treated as ‘gross’ estimates of supply.
Northern Ireland
For the purposes of the Strategic Planning Policy Statement for Northern Ireland (SPPS), ‘affordable housing’ is defined as:
a) Social rented housing; or
b) Intermediate housing for sale; or
c) Intermediate housing for rent
that is provided outside of the general market, for those whose needs are not met by the market. Affordable housing which is funded by Government must remain affordable or alternatively there must be provision for the public subsidy to be repaid or recycled in the provision of new affordable housing.
Social Rented Housing is housing provided at an affordable rent by a Registered Housing Association; that is, one which is registered and regulated by the Department for Communities as a social housing provider. Social rented accommodation should be available to households in housing need and is offered in accordance with the Common Selection Scheme, administered by the Northern Ireland Housing Executive, which prioritises households who are living in unsuitable or insecure accommodation.
Intermediate Housing for sale consists of shared ownership housing provided through a Registered Housing Association (e.g. the Co Ownership Housing Association) and helps households who can afford a small mortgage, but that are not able to afford to buy a property outright. The property is split between part ownership by the householder and part social renting from the Registered Housing Association. The proportion of property ownership and renting can vary depending on householder circumstances and preferences.
Intermediate Housing for rent products are currently not available in Northern Ireland. However, the Department for Communities, as part of a programme of work to explore the development of new, good quality, secure and affordable rent products, has recently launched a public consultation seeking views on policy proposals for the introduction of an Intermediate Rent Model for the housing market in Northern Ireland. The consultation will close on 14 January 2022.
This definition of intermediate housing used for the purpose of this policy may change over time to incorporate other forms of housing tenure below open market rates.
Northern Ireland Statistics and Research Agency and the Department for Communities publish an annual compendium on housing statistics, which includes data tables relating to changes to social stock. This can be found via their web pages here: https://www.communities-ni.gov.uk/topics/housing-statistics
This includes tables on new build completions by housing associations and in the social rented sector and information on co-ownership sales (the equivalent of affordable home ownership HomeBuy schemes in Great Britain).
User consultation
Users’ comments on any issues relating to this document are welcomed and encouraged. Responses should be sent to the “Statistical Enquiries” address given below.
Enquiries
Media Enquiries
Email: [email protected]
Telephone: 020 7874 8262
Statistical Enquiries
Mike Shone (c/o)
Email: [email protected]
Telephone: 01234 242537
0300 1234 500
-
https://www.gov.uk/government/publications/statistical-notice-dclg-revisions-policy ↩
-
https://www.gov.uk/government/publications/national-planning-policy-framework–2 ↩
-
http://www.legislation.gov.uk/ukpga/2008/17/pdfs/ukpga_20080017_en.pdf ↩
-
http://www.legislation.gov.uk/ukpga/2008/17/pdfs/ukpga_20080017_en.pdf ↩
-
https://www.ons.gov.uk/news/statementsandletters/statementonclassificationofenglishhousingassociationsnovember2017 ↩
-
https://www.gov.uk/government/collections/affordable-housing-supply ↩
-
https://www.london.gov.uk/what-we-do/housing-and-land/increasing-housing-supply/affordable-housing-statistics ↩
-
https://www.gov.uk/government/statistical-data-sets/live-tables-on-affordable-housing-supply ↩
-
https://www.gov.uk/government/collections/housing-statistics ↩
-
https://www.gov.uk/government/publications/homes-england-annual-report-financial-statements-202021 ↩
-
https://www.gov.uk/government/collections/help-to-buy-equity-loan-and-newbuy-statistics ↩
-
The private sector units leased for more than 1 year to house homeless families and included within the overall total do not fully conform to the (TAN)2 definition. ↩