Electricity generation licence requirement: proposed exemption for Kype Muir Extension Windfarm
A proposal to exempt the Kype Muir Extension Windfarm from generation licensing requirements.
Documents
Details
A proposal to make exemptions from the requirement to hold a generation licence for:
- Banks Renewables (Harting Rig Wind Farm) Limited in respect of the Kype Muir Extension Wind Farm, a 67.2MW plant located approximately 6.5km to the South of Strathaven, South Lanarkshire
Please send responses by 20 April 2021 to:
Chris Chown, email: [email protected].