Notice

Proposal to make Orders giving exemption from the requirement for a licence to generate electricity

Proposal to make The Electricity (Exemption from the Requirement for a Generation Licence) Order 2017 and The Electricity (Exemption from the Requirement for a Generation Licence) (No 2) Order 2017.

Documents

Details

Views are sought on a proposal to make Orders giving exemption from the requirement for a generation licence to:

  • Heck Fen Wind Park Limited, in respect of the Heckington Fen Wind Park
  • Innogy Renewables UK Limited, in respect of the Brechfa Forest West Wind Farm
  • Ray Wind Farm Limited in, respect of the Ray Wind Farm
  • RWE Cogen UK Limited, in respect of the Cheshire Power Station
  • Snowdonia Pumped Hydro Limited, in respect of the Glyn Rhonwy Pumped Hydro

And:

  • Banks Renewables (Kype Muir Wind Farm) Limited, in respect of Kype Muir Wind Farm
  • Banks Renewables (Middle Muir Wind Farm) Limited, in respect of Middle Muir Wind Farm
  • Brockloch Rig Windfarm Limited, in respect of Brockloch Rig Windfarm (also known as Windy Standard 2 Windfarm)

Representations on the issues raised in the document and the proposal are invited by 2 May 2017 and should be made to:

Chris Chown
Energy Market Framework
Department for Business, Energy and Industrial Strategy
1 Victoria Street
London
SW1H 0ET

Telephone: 0300 068 6085
email: [email protected]

Updates to this page

Published 4 April 2017

Sign up for emails or print this page