Proposal to make Orders giving exemption from the requirement for a licence to generate electricity
Proposal to make The Electricity (Exemption from the Requirement for a Generation Licence) Order 2017 and The Electricity (Exemption from the Requirement for a Generation Licence) (No 2) Order 2017.
Documents
Details
Views are sought on a proposal to make Orders giving exemption from the requirement for a generation licence to:
- Heck Fen Wind Park Limited, in respect of the Heckington Fen Wind Park
- Innogy Renewables UK Limited, in respect of the Brechfa Forest West Wind Farm
- Ray Wind Farm Limited in, respect of the Ray Wind Farm
- RWE Cogen UK Limited, in respect of the Cheshire Power Station
- Snowdonia Pumped Hydro Limited, in respect of the Glyn Rhonwy Pumped Hydro
And:
- Banks Renewables (Kype Muir Wind Farm) Limited, in respect of Kype Muir Wind Farm
- Banks Renewables (Middle Muir Wind Farm) Limited, in respect of Middle Muir Wind Farm
- Brockloch Rig Windfarm Limited, in respect of Brockloch Rig Windfarm (also known as Windy Standard 2 Windfarm)
Representations on the issues raised in the document and the proposal are invited by 2 May 2017 and should be made to:
Chris Chown
Energy Market Framework
Department for Business, Energy and Industrial Strategy
1 Victoria Street
London
SW1H 0ET
Telephone: 0300 068 6085
email: [email protected]