Research and analysis

Cost and risk status report for HS2

This document explains how High Speed Two Limited (HS2 Ltd) arrived at the estimated cost for the HS2 rail network.

Documents

The economic case for HS2: cost and risk status report

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This report on the cost of the full High Speed Two network details:

  • the methodology behind the estimate that formed the basis of the 2013 Spending Round application
  • the figures used in the economic case

Updates to this page

Published 28 October 2013

Sign up for emails or print this page