Research and analysis

HS2 economic case: risk analysis

Details of how the benefit-cost ratio (BCR) distributions in the 'Economic case for HS2' were calculated.

Documents

The economic case for HS2: risk analysis and technical documentation

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This document provides background information and additional technical detail on the analytical techniques that were used to calculate the benefit-cost ratio (BCR) distributions in the ‘Economic Case for HS2’.

It includes:

  • an introduction to the Risk Analysis Model
  • a description of the modelling approach
  • detail on the inputs and assumptions
  • a glossary of terms

Updates to this page

Published 28 October 2013

Sign up for emails or print this page