Policy paper

HS2 Phase 2a: West Midlands to Crewe design refinement consultation

Consultation on proposed changes to the HS2 route between West Midlands and Crewe.

This was published under the 2016 to 2019 May Conservative government

Documents

High Speed Two Phase 2a: West Midlands to Crewe design refinement consultation (web version)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

High Speed Two Phase 2a: West Midlands to Crewe design refinement consultation (print version)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This consultation seeks views on 3 proposed changes to the HS2 route between the West Midlands and Crewe. These changes include introducing new rail infrastructure not envisaged in the design consulted on in November 2015. They also significantly alter the original design, giving rise to new or increased environmental effects on people, wildlife, land or property.

Updates to this page

Published 13 September 2016

Sign up for emails or print this page